X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374041307A00

Well Details

Well ID: 0374041307A00
Loading map...
Location: A0/07-13-037-04W4/0
Location Alias: A0/07-13-37-04 W4M
Location Alias 2: A0/07-13-037-04 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 04
Section: 13
County/Municipality: Special Areas No. 4
Well Name: GEAR PROVOST 7-13-37-4
Operator Name: Gear Energy Ltd.
License Number: 0146341
License Date: 1990-11-15
License Status: Suspension
Spud Date: 1990-11-29
Final Drill Date: 1990-12-01
Well Total Depth: 905.00 m
Surface Hole Latitude: 52.176074
Surface Hole Longitude: -110.440905

For data sources see[1][2]

Well History

Date Event
1990-11-15 Obtained License
1990-11-29 Lost Circulation Occurred
1990-11-30 Surface Casing Operation Performed
1990-12-01 Finished Drilling
1990-12-01 Well Log Performed
1990-12-01 Well Mode changed to Drilled and Cased
1990-12-02 Lost Circulation Occurred
1990-12-02 Production Casing Operation Performed
1990-12-02 Rig Released
1990-12-07 Perforation Treatment Performed - Jet Perforation
1990-12-07 Well Began Production
1990-12-07 Well Fluid changed to Crude Oil
1990-12-07 Well Mode changed to Pumping
1990-12-08 Perforation Treatment Performed - Cement Squeeze
1990-12-08 Perforation Treatment Performed - Jet Perforation
1990-12-13 Perforation Treatment Performed - Jet Perforation
1991-12-09 Perforation Treatment Performed - Cement Squeeze
1991-12-09 Plug Back Performed
1991-12-09 Well Fluid changed to Crude Oil
1991-12-09 Well Mode changed to Abandoned Zone
1991-12-12 Well Log Performed
1991-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-13 Perforation Treatment Performed - Jet Perforation
1991-12-16 Perforation Treatment Performed - Open-Hole Completion
1991-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-04 Perforation Treatment Performed - Jet Perforation
1992-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-25 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-07 Perforation 858.00 859.00 13
1992-01-04 Perforation 830.00 835.00 13
1992-01-05 Acid Treatment 830.00 835.00 0
1994-11-25 Perforation 860.00 862.00 13
1990-12-08 Perforation 860.50 861.50 13
1990-12-08 Cement Squeeze 858.00 861.50 0
1990-12-13 Perforation 858.00 859.00 13
1991-12-09 Cement Squeeze 858.00 859.00 0
1991-12-13 Perforation 875.00 885.00 13
1991-12-13 Acid Treatment 875.00 885.00 0
1991-12-16 Open Hole/Barefoot Completion 888.10 905.00 0
1991-12-17 Acid Treatment 875.00 905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-11-29 Lost Circulation 110.00 147.00
1990-12-02 Lost Circulation 890.00 890.00

For data sources see[6]

References