X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374070205020

Well Details

Well ID: 0374070205020
Loading map...
Location: 02/05-02-037-07W4/0
Location Alias: 02/05-02-37-07 W4M
Location Alias 2: 02/05-02-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 02
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 5-2-37-7
Operator Name: Cleo Energy Corp.
License Number: 0131487
License Date: 1988-01-19
License Status: Abandoned
Spud Date: 1988-01-20
Final Drill Date: 1988-01-27
Well Total Depth: 981.00 m
Surface Hole Latitude: 52.150019
Surface Hole Longitude: -110.905483

For data sources see[1][2]

Well History

Date Event
1988-01-19 Obtained License
1988-01-21 Surface Casing Operation Performed
1988-01-23 Direction Drilling Operation Performed - Deviate
1988-01-27 Finished Drilling
1988-01-27 Well Log Performed
1988-01-27 Well Mode changed to Drilled and Cased
1988-01-28 Production Casing Operation Performed
1988-01-28 Rig Released
1988-01-28 Well Log Performed
1988-03-05 Well Log Performed
1988-03-07 Perforation Treatment Performed - Jet Perforation
1988-03-17 Well Began Production
1988-03-17 Well Fluid changed to Crude Oil
1988-03-17 Well Mode changed to Pumping
1999-12-16 Well Fluid changed to Crude Oil
1999-12-16 Well Mode changed to Suspended
2009-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-24 Plug Back Performed
2009-01-24 Well Fluid changed to Crude Oil
2009-01-24 Well Mode changed to Abandoned Zone
2017-02-23 Well Abandoned
2017-02-23 Well Fluid changed to Crude Oil
2017-02-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-01-23 520.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-07 Perforation 936.00 939.00 13
2009-01-24 Packing Device Capped w/Cement 919.30 927.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6437 0.0 0.0 0.0
1989 8185 0.0 0.0 0.0
1990 8470 0.0 0.0 0.0
1991 7339 0.0 0.0 0.0
1992 8081 0.0 0.0 0.0
1993 8148 0.0 0.0 0.0
1994 8281 0.0 0.0 0.0
1995 8352 0.0 0.0 0.0
1996 8501 0.0 0.0 0.0
1997 8519 0.0 0.0 0.0
1998 7190 0.0 0.0 0.0

For data sources see[6]

References