X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374071101B00

Well Details

Well ID: 0374071101B00
Loading map...
Location: B0/01-11-037-07W4/0
Location Alias: B0/01-11-37-07 W4M
Location Alias 2: B0/01-11-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 11
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 1-11-37-7
Operator Name: Cleo Energy Corp.
License Number: 0132641
License Date: 1988-02-26
License Status: Abandoned
Spud Date: 1988-03-09
Final Drill Date: 1988-03-14
Well Total Depth: 1020.00 m
Surface Hole Latitude: 52.157219
Surface Hole Longitude: -110.892689

For data sources see[1][2]

Well History

Date Event
1988-02-26 Obtained License
1988-03-10 Surface Casing Operation Performed
1988-03-11 Direction Drilling Operation Performed - Deviate
1988-03-14 Finished Drilling
1988-03-14 Well Log Performed
1988-03-14 Well Mode changed to Drilled and Cased
1988-03-15 Production Casing Operation Performed
1988-03-15 Well Log Performed
1988-03-16 Rig Released
1988-03-25 Well Log Performed
1988-03-28 Perforation Treatment Performed - Jet Perforation
1988-03-31 Well Began Production
1988-03-31 Well Fluid changed to Crude Oil
1988-03-31 Well Mode changed to Pumping
2010-07-25 Well Fluid changed to Crude Oil
2010-07-25 Well Mode changed to Suspended
2015-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-06-18 Plug Back Performed
2015-06-18 Well Fluid changed to Crude Oil
2015-06-18 Well Mode changed to Abandoned Zone
2017-02-23 Well Abandoned
2017-02-23 Well Fluid changed to Crude Oil
2017-02-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-03-11 180.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-28 Perforation 967.50 974.50 13
2015-06-18 Packing Device Capped w/Cement 946.00 955.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6407 0.0 0.0 0.0
1989 8471 0.0 0.0 0.0
1990 8390 0.0 0.0 0.0
1991 7495 0.0 0.0 0.0
1992 8297 0.0 0.0 0.0
1993 8186 0.0 0.0 0.0
1994 6562 0.0 0.0 0.0
1995 7823 0.0 0.0 0.0
1996 8442 0.0 0.0 0.0
1997 8019 0.0 0.0 0.0
1998 8464 0.0 0.0 0.0
1999 8305 0.0 0.0 0.0
2000 7412 0.0 0.0 0.0
2001 5364 0.0 0.0 0.0
2002 6378 0.0 0.0 0.0
2003 5266 0.0 0.0 0.0
2004 1148 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References