X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374072511000

Well Details

Well ID: 0374072511000
Loading map...
Location: 00/11-25-037-07W4/0
Location Alias: 00/11-25-37-07 W4M
Location Alias 2: 00/11-25-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 11-25-37-7
Operator Name: Cleo Energy Corp.
License Number: 0165014
License Date: 1994-02-11
License Status: Suspension
Spud Date: 1994-02-20
Final Drill Date: 1994-02-22
Well Total Depth: 997.00 m
Surface Hole Latitude: 52.210094
Surface Hole Longitude: -110.879706

For data sources see[1][2]

Well History

Date Event
1994-02-11 Obtained License
1994-02-20 Surface Casing Operation Performed
1994-02-22 Finished Drilling
1994-02-22 Well Log Performed
1994-02-22 Well Mode changed to Drilled and Cased
1994-02-23 Drill Stem Test Performed
1994-02-24 Production Casing Operation Performed
1994-02-24 Rig Released
1994-03-04 Well Log Performed
1994-03-16 Perforation Treatment Performed - Jet Perforation
1994-03-16 Well Log Performed
1994-03-17 Perforation Treatment Performed - Remedial Casing
1994-03-21 Perforation Treatment Performed - Fractured
1994-03-21 Perforation Treatment Performed - Jet Perforation
1994-03-21 Well Log Performed
1994-03-22 Perforation Treatment Performed - Fractured
1994-03-22 Perforation Treatment Performed - Jet Perforation
1994-03-22 Well Log Performed
1994-04-01 Well Began Production
1994-04-01 Well Fluid changed to Crude Oil
1994-04-01 Well Mode changed to Pumping
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
2008-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-16 Perforation 385.00 386.00 13
1994-03-17 Remedial Casing Cementing 385.00 386.00 0
1994-03-21 Perforation 939.00 941.00 13
1994-03-21 Fracture 939.00 941.00 0
1994-03-22 Perforation 939.00 941.60 13
1994-03-22 Fracture 939.00 941.60 0
2008-05-13 Packing Device Capped w/Cement 924.00 934.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6085 0.0 0.0 0.0
1995 8416 0.0 0.0 0.0
1996 8329 0.0 0.0 0.0
1997 2825 0.0 0.0 0.0

For data sources see[5]

References