If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374072512042 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.210095,"lon":-110.880204,"icon":""}]} |
Location: 04/12-25-037-07W4/2 | |
Location Alias: 04/12-25-37-07 W4M | |
Location Alias 2: 04/12-25-037-07 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 07 | |
Section: 25 | |
County/Municipality: Special Areas No. 4 | |
Well Name: CLEO ENERGY PROVOST 5-25-37-7 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0165785 | |
License Date: 1994-03-10 | |
License Status: Suspension | |
Spud Date: 1994-04-21 | |
Final Drill Date: 1994-04-27 | |
Well Total Depth: 1038.00 m | |
Surface Hole Latitude: 52.210095 | |
Surface Hole Longitude: -110.880204 |
Date | Event |
---|---|
1994-03-10 | Obtained License |
1994-04-21 | Surface Casing Operation Performed |
1994-04-25 | Direction Drilling Operation Performed - Deviate |
1994-04-27 | Finished Drilling |
1994-04-27 | Well Log Performed |
1994-04-27 | Well Mode changed to Drilled and Cased |
1994-04-28 | Production Casing Operation Performed |
1994-04-28 | Rig Released |
1994-04-28 | Well Log Performed |
1994-05-04 | Perforation Treatment Performed - Fractured |
1994-05-04 | Perforation Treatment Performed - Jet Perforation |
1994-05-13 | Well Began Production |
1994-05-13 | Well Fluid changed to Crude Oil |
1994-05-13 | Well Mode changed to Pumping |
1998-10-30 | Well Fluid changed to Crude Oil |
1998-10-30 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-04-25 | 179.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-05-04 | Perforation | 986.50 | 989.00 | 14 |
1994-05-04 | Fracture | 986.50 | 989.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4937 | 0.0 | 0.0 | 0.0 |
1995 | 8395 | 0.0 | 0.0 | 0.0 |
1996 | 8463 | 0.0 | 0.0 | 0.0 |
1997 | 2799 | 0.0 | 0.0 | 0.0 |
For data sources see[6]