X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374083207022

Well Details

Well ID: 0374083207022
Loading map...
Location: 02/07-32-037-08W4/2
Location Alias: 02/07-32-37-08 W4M
Location Alias 2: 02/07-32-037-08 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 08
Section: 32
County/Municipality: Special Areas No. 4
Well Name: KARVE PROVOST 7-32-37-8
Operator Name: Battle River Energy Ltd.
License Number: 0335612
License Date: 2005-07-28
License Status: Suspension
Spud Date: 2005-09-27
Final Drill Date: 2005-09-30
Well Total Depth: 953.00 m
Surface Hole Latitude: 52.219710
Surface Hole Longitude: -111.106750

For data sources see[1][2]

Well History

Date Event
2005-07-28 Obtained License
2005-09-27 Surface Casing Operation Performed
2005-09-30 Finished Drilling
2005-09-30 Well Mode changed to Drilled and Cased
2005-10-01 Production Casing Operation Performed
2005-10-01 Rig Released
2005-10-01 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-12 Well Log Performed
2005-10-13 Perforation Treatment Performed - Fractured
2005-10-15 Perforation Treatment Performed - Jet Perforation
2005-10-15 Well Log Performed
2005-10-18 Perforation Treatment Performed - Fractured
2009-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-23 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-07-23 Plug Back Performed
2009-07-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-12 Perforation 915.00 917.00 20
2005-10-12 Perforation 904.90 906.90 20
2005-10-13 Fracture 904.90 917.00 0
2005-10-15 Perforation 889.00 893.00 20
2005-10-18 Fracture 889.00 893.00 0
2009-07-23 Packing Dev Cpd w/Res-Gyp Cem 911.00 914.00 0
2009-07-23 Packing Device Capped w/Cement 894.00 902.00 0
2009-07-23 Packing Device Capped w/Cement 878.00 885.00 0
2009-07-24 Perforation 794.00 798.00 17

For data sources see[4]



References