If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374111615000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/15-16-037-11W4/0 | |
Location Alias: 00/15-16-37-11 W4M | |
Location Alias 2: 00/15-16-037-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 11 | |
Section: 16 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: EAGLE TURBO ET AL PROVO 15-16-37-11 | |
Operator Name: Carlyle Energy Ltd. | |
License Number: 0087165 | |
License Date: 1980-11-20 | |
License Status: RecCertified | |
Spud Date: 1980-11-21 | |
Final Drill Date: 1980-11-28 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 52.183565 | |
Surface Hole Longitude: -111.511622 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-20 | Obtained License |
1980-11-24 | Drill Stem Test Performed |
1980-11-25 | Drill Stem Test Performed |
1980-11-26 | Drill Stem Test Performed |
1980-11-27 | Drill Stem Test Performed |
1980-11-28 | Finished Drilling |
1980-11-29 | Production Casing Operation Performed |
1980-12-14 | Perforation Treatment Performed - Jet Perforation |
1980-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-18 | Perforation Treatment Performed - Cement Squeeze |
1980-12-19 | Perforation Treatment Performed - Jet Perforation |
1980-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-06 | Perforation Treatment Performed - Jet Perforation |
1981-01-10 | Perforation Treatment Performed - Cement Squeeze |
1981-01-14 | Perforation Treatment Performed - Jet Perforation |
1981-01-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-20 | Well Mode changed to Drilled and Cased |
1983-09-27 | Well Began Production |
1983-09-27 | Well Fluid changed to Crude Oil |
1983-09-27 | Well Mode changed to Flowing |
1983-10-03 | Well Fluid changed to Crude Oil |
1983-10-03 | Well Mode changed to Suspended |
1984-11-30 | Well Fluid changed to Crude Oil |
1984-11-30 | Well Mode changed to Pumping |
1985-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-12-18 | Well Abandoned |
1985-12-18 | Well Fluid changed to Crude Oil |
1985-12-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-12-14 | Perforation | 1030.00 | 1031.50 | 4 |
1981-01-16 | Acid Treatment | 1014.30 | 1015.60 | 0 |
1985-12-18 | Packing Device Capped w/Cement | 997.00 | 1005.00 | 0 |
1980-12-17 | Acid Treatment | 1030.00 | 1031.50 | 0 |
1980-12-18 | Cement Squeeze | 1030.00 | 1031.50 | 0 |
1980-12-19 | Perforation | 1024.00 | 1025.60 | 5 |
1980-12-21 | Acid Treatment | 1024.00 | 1025.60 | 0 |
1981-01-06 | Perforation | 1014.30 | 1015.60 | 7 |
1981-01-06 | Perforation | 1017.50 | 1018.80 | 7 |
1981-01-10 | Cement Squeeze | 1014.30 | 1025.60 | 0 |
1981-01-14 | Perforation | 1014.30 | 1015.60 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 58 | 0.0 | 0.0 | 0.0 |
1984 | 702 | 0.0 | 0.0 | 0.0 |
1985 | 1434 | 0.0 | 0.0 | 0.0 |
For data sources see[5]