X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374112611000

Well Details

Well ID: 0374112611000
Loading map...
Location: 00/11-26-037-11W4/0
Location Alias: 00/11-26-37-11 W4M
Location Alias 2: 00/11-26-037-11 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 11
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 11-26-37-11
Operator Name: Battle River Energy Ltd.
License Number: 0253769
License Date: 2001-04-06
License Status: Issued
Spud Date: 2001-05-15
Final Drill Date: 2001-05-17
Well Total Depth: 1004.00 m
Surface Hole Latitude: 52.210978
Surface Hole Longitude: -111.471400

For data sources see[1][2]

Well History

Date Event
2001-04-06 Obtained License
2001-05-16 Surface Casing Operation Performed
2001-05-17 Finished Drilling
2001-05-18 Well Log Performed
2001-05-19 Production Casing Operation Performed
2001-05-19 Rig Released
2001-05-19 Well Mode changed to Drilled and Cased
2001-05-30 Perforation Treatment Performed - Jet Perforation
2001-05-30 Well Log Performed
2001-05-31 Perforation Treatment Performed - Jet Perforation
2001-06-10 Perforation Treatment Performed - Fractured
2002-02-01 Well Began Production
2002-02-01 Well Fluid changed to Gas
2002-02-01 Well Mode changed to Flowing
2002-03-13 Perforation Treatment Performed - Jet Perforation
2002-03-13 Well Log Performed
2002-05-13 Well Log Performed
2002-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-15 Perforation Treatment Performed - Jet Perforation
2002-05-15 Plug Back Performed
2002-05-15 Well Fluid changed to Gas
2002-05-15 Well Log Performed
2002-05-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-05-30 Perforation 938.50 940.00 17
2001-05-31 Perforation 839.50 840.50 20
2001-05-31 Perforation 848.50 849.50 20
2001-05-31 Perforation 850.50 851.50 20
2001-06-10 Fracture 839.50 851.50 0
2002-03-13 Perforation 938.50 940.00 14
2002-05-15 Packing Device Capped w/Cement 927.00 935.00 0
2002-05-15 Perforation 338.50 339.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 460 0.0 0.0 0.0

For data sources see[5]

References