If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374121911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.197287,"lon":-111.711482,"icon":""}]} |
| Location: 00/11-19-037-12W4/0 | |
| Location Alias: 00/11-19-37-12 W4M | |
| Location Alias 2: 00/11-19-037-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 19 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ACL PROVOST 11-19-37-12 | |
| Operator Name: Sekur Energy Management Corp. | |
| License Number: 0066083 | |
| License Date: 1977-10-11 | |
| License Status: Abandoned | |
| Spud Date: 1977-10-19 | |
| Final Drill Date: 1977-10-23 | |
| Well Total Depth: 1069.80 m | |
| Surface Hole Latitude: 52.197287 | |
| Surface Hole Longitude: -111.711482 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-10-11 | Obtained License |
| 1977-10-22 | Drill Stem Test Performed |
| 1977-10-23 | Finished Drilling |
| 1977-10-23 | Well Mode changed to Drilled and Cased |
| 1977-10-25 | Drill Stem Test Performed |
| 1977-10-26 | Production Casing Operation Performed |
| 1977-11-29 | Perforation Treatment Performed - Jet Perforation |
| 1979-04-21 | Well Began Production |
| 1979-04-21 | Well Fluid changed to Gas |
| 1979-04-21 | Well Mode changed to Flowing |
| 1987-08-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-08-05 | Plug Back Performed |
| 1987-08-05 | Well Fluid changed to Gas |
| 1987-08-05 | Well Log Performed |
| 1987-08-05 | Well Mode changed to Abandoned Zone |
| 1987-08-06 | Perforation Treatment Performed - Jet Perforation |
| 1987-08-06 | Well Log Performed |
| 1992-10-27 | Perforation Treatment Performed - Cement Squeeze |
| 1992-10-27 | Plug Back Performed |
| 1992-11-18 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1977-11-29 | Perforation | 1047.30 | 1048.50 | 13 |
| 1987-08-05 | Packing Device Capped w/Cement | 1034.40 | 1042.40 | 0 |
| 1987-08-06 | Perforation | 966.20 | 969.20 | 13 |
| 1992-10-27 | Cement Squeeze | 951.40 | 961.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 3809 | 0.0 | 0.0 | 0.0 |
| 1980 | 3288 | 0.0 | 0.0 | 0.0 |
| 1981 | 3898 | 0.0 | 0.0 | 0.0 |
| 1982 | 8566 | 0.0 | 0.0 | 0.0 |
| 1983 | 8596 | 0.0 | 0.0 | 0.0 |
| 1984 | 8361 | 0.0 | 0.0 | 0.0 |
| 1985 | 6463 | 0.0 | 0.0 | 0.0 |
| 1986 | 8333 | 0.0 | 0.0 | 0.0 |
| 1987 | 4982 | 0.0 | 0.0 | 0.0 |
| 1988 | 106 | 0.0 | 0.0 | 0.0 |
For data sources see[5]