X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374141115002

Well Details

Well ID: 0374141115002
Loading map...
Location: 00/15-11-037-14W4/2
Location Alias: 00/15-11-37-14 W4M
Location Alias 2: 00/15-11-037-14 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 14
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 15-11-37-14
Operator Name: Karve Energy Inc.
License Number: 0108469
License Date: 1984-07-27
License Status: Suspension
Spud Date: 1984-08-01
Final Drill Date: 1984-08-05
Well Total Depth: 1068.00 m
Surface Hole Latitude: 52.169043
Surface Hole Longitude: -111.896828

For data sources see[1][2]

Well History

Date Event
1984-07-27 Obtained License
1984-08-02 Surface Casing Operation Performed
1984-08-05 Finished Drilling
1984-08-05 Well Log Performed
1984-08-05 Well Mode changed to Drilled and Cased
1984-08-06 Drill Stem Test Performed
1984-08-07 Drill Stem Test Performed
1984-08-08 Production Casing Operation Performed
1984-08-08 Rig Released
1984-10-24 Well Log Performed
1984-10-25 Well Log Performed
1984-10-26 Perforation Treatment Performed - Jet Perforation
1984-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-26 Perforation Treatment Performed - Jet Perforation
1993-12-01 Well Began Production
1993-12-01 Well Fluid changed to Gas
1993-12-01 Well Mode changed to Flowing
1997-12-02 Well Fluid changed to Gas
1997-12-02 Well Mode changed to Suspended
1999-06-08 Perforation Treatment Performed - Jet Perforation
1999-06-08 Well Log Performed
1999-08-09 Perforation Treatment Performed - Jet Perforation
1999-08-09 Well Log Performed
1999-09-08 Perforation Treatment Performed - Fractured
1999-09-23 Well Fluid changed to Gas
1999-09-23 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-26 Perforation 949.50 953.00 13
1984-10-26 Perforation 955.00 957.50 13
1984-10-26 Perforation 960.00 962.00 13
1984-10-27 Acid Treatment 949.50 962.00 0
1993-11-26 Perforation 203.50 206.00 13
1993-11-26 Perforation 238.00 240.00 13
1999-06-08 Perforation 1044.00 1053.00 13
1999-08-09 Perforation 1031.50 1037.50 14
1999-09-08 Fracture 1031.50 1037.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 622 0.0 0.0 0.0
1994 7256 0.0 0.0 0.0
1995 3052 0.0 0.0 0.0

For data sources see[5]

References