If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374200302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.144445,"lon":-112.775888,"icon":""}]} |
Location: 00/02-03-037-20W4/0 | |
Location Alias: 00/02-03-37-20 W4M | |
Location Alias 2: 00/02-03-037-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 20 | |
Section: 03 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: CPR HANNA NO. 2 | |
Operator Name: Gulf Canada Limited | |
License Number: 0008400 | |
License Date: 1954-08-23 | |
License Status: RecCertified | |
Spud Date: 1954-10-10 | |
Final Drill Date: 1954-10-28 | |
Well Total Depth: 1620.90 m | |
Surface Hole Latitude: 52.144445 | |
Surface Hole Longitude: -112.775888 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-08-23 | Obtained License |
1954-10-26 | Production Casing Operation Performed |
1954-10-28 | Finished Drilling |
1954-10-28 | Perforation Treatment Performed - Open-Hole Completion |
1954-10-28 | Well Mode changed to Drilled and Cased |
1954-10-30 | Well Began Production |
1954-10-30 | Well Fluid changed to Crude Oil |
1954-10-30 | Well Mode changed to Flowing |
1971-07-25 | Perforation Treatment Performed - Cement Plug |
1971-07-25 | Perforation Treatment Performed - Open-Hole Completion |
1974-11-07 | Well Fluid changed to Crude Oil |
1974-11-07 | Well Mode changed to Pumping |
1982-06-26 | Perforation Treatment Performed - Cement Plug |
1982-06-26 | Perforation Treatment Performed - Open-Hole Completion |
1982-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-02-18 | Perforation Treatment Performed - Cement Plug |
1983-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-02-19 | Perforation Treatment Performed - Jet Perforation |
1993-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-08-25 | Perforation Treatment Performed - Jet Perforation |
1993-08-25 | Plug Back Performed |
1993-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-08-26 | Perforation Treatment Performed - Remedial Casing |
1993-08-26 | Well Fluid changed to Crude Oil |
1993-08-26 | Well Mode changed to Abandoned |
1993-08-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-10-28 | Open Hole/Barefoot Completion | 1609.00 | 1620.90 | 0 |
1993-08-25 | Packing Device Capped w/Cement | 1586.00 | 1594.00 | 0 |
1993-08-25 | Perforation | 227.80 | 228.30 | 13 |
1993-08-26 | Remedial Casing Cementing | 227.80 | 228.30 | 0 |
1993-08-26 | Packing Device Capped w/Cement | 180.00 | 223.30 | 0 |
1971-07-25 | Cement Plug | 1613.90 | 1620.90 | 0 |
1971-07-25 | Open Hole/Barefoot Completion | 1609.00 | 1613.90 | 0 |
1982-06-26 | Cement Plug | 1610.40 | 1613.90 | 0 |
1982-06-26 | Open Hole/Barefoot Completion | 1609.00 | 1610.40 | 0 |
1982-06-30 | Acid Treatment | 1609.00 | 1610.40 | 0 |
1983-02-18 | Cement Plug | 1606.20 | 1610.40 | 0 |
1983-02-19 | Perforation | 1602.60 | 1605.90 | 13 |
1983-02-19 | Acid Treatment | 1602.60 | 1605.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 2934 | 0.0 | 0.0 | 0.0 |
1971 | 4256 | 0.0 | 0.0 | 0.0 |
1972 | 5907 | 0.0 | 0.0 | 0.0 |
1973 | 7699 | 0.0 | 0.0 | 0.0 |
1974 | 7226 | 0.0 | 0.0 | 0.0 |
1975 | 6740 | 0.0 | 0.0 | 0.0 |
1976 | 5772 | 0.0 | 0.0 | 0.0 |
1977 | 5430 | 0.0 | 0.0 | 0.0 |
1978 | 6150 | 0.0 | 0.0 | 0.0 |
1979 | 8146 | 0.0 | 0.0 | 0.0 |
1980 | 6817 | 0.0 | 0.0 | 0.0 |
1981 | 8606 | 0.0 | 0.0 | 0.0 |
1982 | 7936 | 0.0 | 0.0 | 0.0 |
1983 | 3432 | 0.0 | 0.0 | 0.0 |
1987 | 24 | 0.0 | 0.0 | 0.0 |
1993 | 1080 | 0.0 | 0.0 | 0.0 |
For data sources see[5]