X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374212308000

Well Details

Well ID: 0374212308000
Loading map...
Location: 00/08-23-037-21W4/0
Location Alias: 00/08-23-37-21 W4M
Location Alias 2: 00/08-23-037-21 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 21
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: BLAIR ASHLAND EWING IN 8-23-37-21
Operator Name: Blair Oil Company
License Number: 0020274
License Date: 1961-01-16
License Status: RecCertified
Spud Date: 1961-01-15
Final Drill Date: 1961-02-02
Well Total Depth: 1694.70 m
Surface Hole Latitude: 52.192491
Surface Hole Longitude: -112.889659

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-16 Obtained License
1961-02-01 Drill Stem Test Performed
1961-02-02 Finished Drilling
1961-02-02 Well Mode changed to Drilled and Cased
1961-02-03 Production Casing Operation Performed
1961-02-09 Perforation Treatment Performed - Bullet Perforation
1961-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-01 Well Began Production
1961-03-01 Well Fluid changed to Crude Oil
1961-03-01 Well Mode changed to Flowing
1961-05-19 Well Fluid changed to Crude Oil
1961-05-19 Well Mode changed to Pumping
1963-10-22 Well Fluid changed to Crude Oil
1963-10-22 Well Mode changed to Suspended
1966-05-31 Perforation Treatment Performed - Cement Squeeze
1966-06-07 Perforation Treatment Performed - Open-Hole Completion
1966-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-01 Well Began Injection
1966-08-01 Well Fluid changed to Water
1966-08-01 Well Type changed to Disposal
1988-02-24 Well Fluid changed to Water
1988-02-24 Well Mode changed to Suspended
1988-02-24 Well Type changed to Disposal
1989-09-18 Well Log Performed
1989-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-19 Plug Back Performed
1989-09-19 Well Fluid changed to Water
1989-09-19 Well Log Performed
1989-09-19 Well Mode changed to Abandoned
1989-09-19 Well Type changed to Disposal
1989-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-20 Plug Back Performed
1989-09-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-02-09 Bullet Perforation 1663.00 1663.60 7
1961-02-10 Acid Treatment 1663.00 1663.60 0
1966-05-31 Cement Squeeze 1663.00 1663.60 0
1966-06-07 Open Hole/Barefoot Completion 1674.90 1694.70 0
1966-06-09 Acid Treatment 1674.90 1694.70 0
1989-09-19 Packing Device Capped w/Cement 1632.00 1640.00 0
1989-09-20 Packing Device Capped w/Cement 937.00 945.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References