X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374212603020

Well Details

Well ID: 0374212603020
Loading map...
Location: 02/03-26-037-21W4/0
Location Alias: 02/03-26-37-21 W4M
Location Alias 2: 02/03-26-037-21 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 21
Section: 26
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW 102 EWINGLK 3-26-37-21
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0444161
License Date: 2012-02-15
License Status: Issued
Spud Date: 2012-03-07
Final Drill Date: 2012-03-09
Well Total Depth: 735.00 m
Surface Hole Latitude: 52.204632
Surface Hole Longitude: -112.901446

For data sources see[1][2]

Well History

Date Event
2012-02-15 Obtained License
2012-03-08 Surface Casing Operation Performed
2012-03-09 Finished Drilling
2012-03-09 Production Casing Operation Performed
2012-03-09 Well Mode changed to Drilled and Cased
2012-03-10 Rig Released
2012-03-17 Well Log Performed
2015-04-30 Perforation Treatment Performed - Jet Perforation
2015-06-01 Well Began Production
2015-06-01 Well Fluid changed to Coalbed Methane-Coals Only
2015-06-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-07 Bearspaw Petroleum Ltd. 2 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-04-30 Perforation 686.20 687.70 13
2015-04-30 Perforation 292.00 294.00 13
2015-04-30 Perforation 288.50 291.00 13
2015-04-30 Perforation 279.80 281.30 13
2015-04-30 Perforation 274.30 275.30 13
2015-04-30 Perforation 269.50 271.00 13
2015-04-30 Perforation 266.50 268.00 13
2015-04-30 Perforation 256.50 258.00 13
2015-04-30 Perforation 229.50 230.50 13
2015-04-30 Perforation 224.50 226.00 13
2015-04-30 Perforation 214.80 216.80 13
2015-04-30 Perforation 369.00 370.50 13
2015-04-30 Perforation 362.50 363.50 13
2015-04-30 Perforation 352.70 353.70 13
2015-04-30 Perforation 325.50 327.00 13
2015-04-30 Perforation 313.40 314.40 13
2015-04-30 Perforation 309.00 311.50 13
2015-04-30 Perforation 305.00 306.50 13
2015-04-30 Perforation 295.50 296.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4978 0.0 0.0 0.0
2016 8375 0.0 0.0 0.0
2017 6691 0.0 0.0 0.0
2018 5116 0.0 0.0 0.0
2019 5905 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References