X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374230302002

Well Details

Well ID: 0374230302002
Loading map...
Location: 00/02-03-037-23W4/2
Location Alias: 00/02-03-37-23 W4M
Location Alias 2: 00/02-03-037-23 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 23
Section: 03
County/Municipality: Red Deer County
Well Name: SUN CENTURY MIKWAN 2-3-37-23
Operator Name: Sun Century Petroleum Corporation
License Number: 0169861
License Date: 1994-08-24
License Status: Abandoned
Spud Date: 1994-09-21
Final Drill Date: 1994-10-07
Well Total Depth: 2175.00 m
Surface Hole Latitude: 52.145958
Surface Hole Longitude: -113.203394

For data sources see[1][2]

Well History

Date Event
1994-08-24 Obtained License
1994-09-21 Lost Circulation Occurred
1994-09-22 Surface Casing Operation Performed
1994-10-07 Finished Drilling
1994-10-07 Well Log Performed
1994-10-07 Well Mode changed to Drilled and Cased
1994-10-08 Drill Stem Test Performed
1994-10-09 Production Casing Operation Performed
1994-10-10 Rig Released
1994-10-30 Well Log Performed
1994-11-05 Perforation Treatment Performed - Jet Perforation
1994-12-17 Well Log Performed
1994-12-18 Perforation Treatment Performed - Jet Perforation
1994-12-18 Well Mode changed to Drilled and Cased
1999-03-08 Well Began Production
1999-03-08 Well Fluid changed to Gas
1999-03-08 Well Mode changed to Flowing
2009-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-28 Plug Back Performed
2009-10-28 Well Fluid changed to Gas
2009-10-28 Well Log Performed
2009-10-28 Well Mode changed to Abandoned Zone
2009-10-29 Well Log Performed
2009-10-30 Perforation Treatment Performed - Jet Perforation
2009-10-30 Well Log Performed
2009-10-31 Perforation Treatment Performed - Remedial Casing
2009-11-02 Perforation Treatment Performed - Cement Plug
2009-11-02 Plug Back Performed
2009-11-02 Well Fluid changed to Gas
2009-11-02 Well Mode changed to Abandoned
2009-11-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-05 Perforation 1713.00 1716.50 13
2009-10-31 Remedial Casing Cementing 400.00 401.00 0
2009-10-31 Remedial Casing Cementing 624.00 625.00 0
2009-10-31 Remedial Casing Cementing 500.00 501.00 0
2009-10-31 Remedial Casing Cementing 556.10 557.10 0
2009-10-31 Remedial Casing Cementing 519.00 520.00 0
2009-11-02 Cement Plug 185.80 643.00 0
1994-12-18 Perforation 1561.50 1563.00 13
2009-10-28 Packing Device Capped w/Cement 1699.00 1707.00 0
2009-10-28 Packing Device Capped w/Cement 1547.00 1555.00 0
2009-10-30 Perforation 400.00 401.00 13
2009-10-30 Perforation 624.00 625.00 13
2009-10-30 Perforation 500.00 501.00 13
2009-10-30 Perforation 556.10 557.10 13
2009-10-30 Perforation 519.00 520.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6061 0.0 0.0 0.0
2000 5380 0.0 0.0 0.0
2001 5137 0.0 0.0 0.0
2002 8390 0.0 0.0 0.0
2003 8703 0.0 0.0 0.0
2004 8751 0.0 0.0 0.0
2005 8750 0.0 0.0 0.0
2006 8756 0.0 0.0 0.0
2007 4460 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-09-21 Lost Circulation 25.00 25.00

For data sources see[6]

References