X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374252216000

Well Details

Well ID: 0374252216000
Loading map...
Location: 00/16-22-037-25W4/0
Location Alias: 00/16-22-37-25 W4M
Location Alias 2: 00/16-22-037-25 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 25
Section: 22
County/Municipality: Red Deer County
Well Name: SOC THREEHCK 16-22-37-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0082233
License Date: 1980-04-21
License Status: Abandoned
Spud Date: 1980-04-27
Final Drill Date: 1980-05-13
Well Total Depth: 2070.00 m
Surface Hole Latitude: 52.198174
Surface Hole Longitude: -113.486066

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-21 Obtained License
1980-05-05 Drill Stem Test Performed
1980-05-13 Finished Drilling
1980-05-13 Well Mode changed to Drilled and Cased
1980-05-15 Well Log Performed
1980-05-16 Drill Stem Test Performed
1980-05-17 Drill Stem Test Performed
1980-05-18 Production Casing Operation Performed
1980-06-03 Perforation Treatment Performed - Jet Perforation
1980-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-06 Perforation Treatment Performed - Cement Squeeze
1980-06-10 Perforation Treatment Performed - Jet Perforation
1980-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-05 Perforation Treatment Performed - Cement Squeeze
1980-07-11 Perforation Treatment Performed - Jet Perforation
1980-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Pumping
1981-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-25 Perforation Treatment Performed - Jet Perforation
2005-02-15 Well Log Performed
2005-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-17 Plug Back Performed
2005-02-17 Well Fluid changed to Crude Oil
2005-02-17 Well Mode changed to Abandoned Zone
2005-02-18 Perforation Treatment Performed - Cement Plug
2005-02-20 Perforation Treatment Performed - Jet Perforation
2005-02-23 Perforation Treatment Performed - Cement Squeeze
2005-04-09 Well Abandoned
2005-04-09 Well Fluid changed to Crude Oil
2005-04-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-03 Perforation 2024.50 2026.50 7
1981-05-25 Perforation 2027.50 2029.00 7
1981-05-25 Acid Treatment 2024.50 2029.00 0
2005-02-17 Packing Device Capped w/Cement 2002.00 2010.00 0
2005-02-18 Cement Plug 844.00 863.00 0
2005-02-20 Perforation 335.00 336.00 7
2005-02-23 Cement Squeeze 335.00 336.00 0
1980-06-04 Acid Treatment 2024.50 2026.50 0
1980-06-06 Cement Squeeze 2024.50 2026.50 0
1980-06-10 Perforation 2024.50 2026.00 7
1980-06-11 Acid Treatment 2024.50 2026.00 0
1980-07-05 Cement Squeeze 2024.50 2026.00 0
1980-07-11 Perforation 2024.50 2026.00 7
1980-07-13 Acid Treatment 2024.50 2026.00 0
1980-07-16 Acid Treatment 2024.50 2026.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1977 0.0 0.0 0.0
1981 6877 0.0 0.0 0.0
1982 7627 0.0 0.0 0.0
1983 7881 0.0 0.0 0.0
1984 8008 0.0 0.0 0.0
1985 7696 0.0 0.0 0.0
1986 6912 0.0 0.0 0.0
1987 7776 0.0 0.0 0.0
1988 7253 0.0 0.0 0.0
1989 8547 0.0 0.0 0.0
1990 8217 0.0 0.0 0.0
1991 8472 0.0 0.0 0.0
1992 8009 0.0 0.0 0.0
1993 8469 0.0 0.0 0.0
1994 8433 0.0 0.0 0.0
1995 8376 0.0 0.0 0.0
1996 7474 0.0 0.0 0.0
1997 8423 0.0 0.0 0.0
1998 3240 0.0 0.0 0.0

For data sources see[5]

References