X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374260305000

Well Details

Well ID: 0374260305000
Loading map...
Location: 00/05-03-037-26W4/0
Location Alias: 00/05-03-37-26 W4M
Location Alias 2: 00/05-03-037-26 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 26
Section: 03
County/Municipality: Red Deer County
Well Name: Vantage JOFFRE 5-3-37-26
Operator Name: Vantage Point Resources Inc.
License Number: 0319865
License Date: 2004-11-26
License Status: Issued
Spud Date: 2004-12-02
Final Drill Date: 2004-12-03
Well Total Depth: 430.00 m
Surface Hole Latitude: 52.148641
Surface Hole Longitude: -113.642796

For data sources see[1][2]

Well History

Date Event
2004-11-26 Obtained License
2004-12-03 Finished Drilling
2004-12-03 Surface Casing Operation Performed
2004-12-03 Well Mode changed to Drilled and Cased
2004-12-04 Production Casing Operation Performed
2004-12-04 Rig Released
2004-12-04 Well Log Performed
2004-12-09 Perforation Treatment Performed - Jet Perforation
2004-12-12 Well Log Performed
2004-12-16 Perforation Treatment Performed - Fractured
2005-01-27 Well Began Production
2005-01-27 Well Fluid changed to Gas
2005-01-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-12-09 Perforation 349.60 350.60 14
2004-12-09 Perforation 279.70 280.70 14
2004-12-09 Perforation 274.00 275.00 14
2004-12-16 Fracture 347.30 348.30 0
2004-12-16 Fracture 349.60 350.60 0
2004-12-16 Fracture 319.50 320.50 0
2004-12-16 Fracture 318.00 319.00 0
2004-12-16 Fracture 316.00 317.00 0
2004-12-16 Fracture 314.30 315.30 0
2004-12-16 Fracture 312.00 313.00 0
2004-12-16 Fracture 295.70 296.70 0
2004-12-09 Perforation 347.30 348.30 14
2004-12-16 Fracture 292.50 293.50 0
2004-12-16 Fracture 279.70 280.70 0
2004-12-16 Fracture 274.00 275.00 0
2004-12-09 Perforation 319.50 320.50 14
2004-12-09 Perforation 318.00 319.00 14
2004-12-09 Perforation 316.00 317.00 14
2004-12-09 Perforation 314.30 315.30 14
2004-12-09 Perforation 312.00 313.00 14
2004-12-09 Perforation 295.70 296.70 14
2004-12-09 Perforation 292.50 293.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7919 0.0 0.0 0.0
2006 8413 0.0 0.0 0.0
2007 8584 0.0 0.0 0.0
2008 8546 0.0 0.0 0.0
2009 8540 0.0 0.0 0.0
2010 8400 0.0 0.0 0.0
2011 8589 0.0 0.0 0.0
2012 8462 0.0 0.0 0.0
2013 8654 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8649 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 8712 0.0 0.0 0.0
2019 8430 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[5]

References