X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374260816003

Well Details

Well ID: 0374260816003
Loading map...
Location: 00/16-08-037-26W4/3
Location Alias: 00/16-08-37-26 W4M
Location Alias 2: 00/16-08-037-26 W4/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 26
Section: 08
County/Municipality: Red Deer County
Well Name: Vantage JOFFRE 16-8-37-26
Operator Name: Vantage Point Resources Inc.
License Number: 0192016
License Date: 1996-10-03
License Status: Suspension
Spud Date: 1996-10-08
Final Drill Date: 1996-10-17
Well Total Depth: 1830.00 m
Surface Hole Latitude: 52.168961
Surface Hole Longitude: -113.675551

For data sources see[1][2]

Well History

Date Event
1996-10-03 Obtained License
1996-10-09 Surface Casing Operation Performed
1996-10-17 Finished Drilling
1996-10-17 Well Log Performed
1996-10-17 Well Mode changed to Drilled and Cased
1996-10-18 Drill Stem Test Performed
1996-10-19 Drill Stem Test Performed
1996-10-20 Drill Stem Test Performed
1996-10-21 Production Casing Operation Performed
1996-10-21 Rig Released
1996-10-28 Well Log Performed
1996-10-29 Perforation Treatment Performed - Jet Perforation
1996-10-29 Well Log Performed
1996-10-30 Well Log Performed
1996-10-31 Perforation Treatment Performed - Fractured
1996-10-31 Perforation Treatment Performed - Jet Perforation
1996-10-31 Well Log Performed
2004-12-11 Well Log Performed
2004-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-15 Plug Back Performed
2004-12-15 Well Log Performed
2004-12-16 Perforation Treatment Performed - Jet Perforation
2004-12-16 Well Log Performed
2004-12-22 Perforation Treatment Performed - Fractured
2005-01-19 Well Began Production
2005-01-19 Well Fluid changed to Gas
2005-01-19 Well Mode changed to Flowing
2009-05-29 Well Fluid changed to Gas
2009-05-29 Well Mode changed to Suspended
2015-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-28 Plug Back Performed
2015-10-28 Well Fluid changed to Gas
2015-10-28 Well Log Performed
2015-10-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-29 Perforation 1789.00 1790.20 14
1996-10-31 Perforation 1588.50 1590.50 18
1996-10-31 Fracture 1588.50 1590.50 0
2004-12-15 Packing Device Capped w/Cement 1741.50 1749.50 0
2004-12-15 Packing Device Capped w/Cement 1571.00 1579.00 0
2004-12-16 Perforation 993.50 995.50 17
2004-12-16 Perforation 996.50 998.00 17
2004-12-22 Fracture 993.50 998.00 0
2015-10-28 Packing Device Capped w/Cement 977.00 985.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 169 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References