X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031508000

Well Details

Well ID: 0375031508000
Loading map...
Location: 00/08-15-037-03W5/0
Location Alias: 00/08-15-37-03 W5M
Location Alias 2: 00/08-15-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 15
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 8-15-37-3
Operator Name: NAL Resources Limited
License Number: 0020661
License Date: 1961-04-24
License Status: Suspension
Spud Date: 1961-05-15
Final Drill Date: 1961-06-08
Well Total Depth: 2275.90 m
Surface Hole Latitude: 52.179086
Surface Hole Longitude: -114.338033

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-04-24 Obtained License
1961-06-04 Drill Stem Test Performed
1961-06-06 Drill Stem Test Performed
1961-06-08 Finished Drilling
1961-06-08 Well Mode changed to Drilled and Cased
1961-06-09 Drill Stem Test Performed
1961-06-10 Production Casing Operation Performed
1961-06-12 Perforation Treatment Performed - Jet Perforation
1961-06-14 Perforation Treatment Performed - Cement Squeeze
1961-06-20 Perforation Treatment Performed - Bullet Perforation
1961-06-22 Perforation Treatment Performed - Cement Squeeze
1961-06-24 Perforation Treatment Performed - Jet Perforation
1961-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-07-05 Well Began Production
1961-07-05 Well Fluid changed to Crude Oil
1961-07-05 Well Mode changed to Flowing
1964-10-29 Well Fluid changed to Crude Oil
1964-10-29 Well Mode changed to Pumping
1977-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-25 Perforation Treatment Performed - Jet Perforation
1984-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-10 Perforation Treatment Performed - Jet Perforation
1993-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-19 Perforation Treatment Performed - Cement Squeeze
2003-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-23 Plug Back Performed
2003-12-23 Well Fluid changed to Crude Oil
2003-12-23 Well Log Performed
2003-12-23 Well Mode changed to Abandoned Zone
2003-12-29 Well Log Performed
2003-12-30 Well Log Performed
2003-12-31 Perforation Treatment Performed - Jet Perforation
2004-01-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-02 Plug Back Performed
2004-01-02 Well Log Performed
2004-01-03 Perforation Treatment Performed - Jet Perforation
2004-01-03 Well Log Performed
2004-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-04 Perforation Treatment Performed - Cement Squeeze
2004-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-06 Perforation Treatment Performed - Cement Squeeze
2004-01-09 Perforation Treatment Performed - Jet Perforation
2013-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-12 Perforation 2259.50 2261.90 7
1993-08-10 Perforation 2250.60 2253.00 13
1993-08-11 Acid Treatment 2250.60 2253.00 0
2003-12-19 Cement Squeeze 2250.60 2257.90 0
2003-12-23 Packing Device Capped w/Cement 2232.00 2240.00 0
2003-12-31 Perforation 2187.70 2189.20 17
2004-01-02 Packing Device Capped w/Cement 2168.00 2176.00 0
2004-01-03 Perforation 1995.00 1996.00 17
2004-01-03 Perforation 1960.00 1961.00 17
2004-01-04 Acid Treatment 1995.00 1996.00 0
2004-01-04 Cement Squeeze 1995.00 1996.00 0
1961-06-14 Cement Squeeze 2259.50 2261.90 0
2004-01-05 Acid Treatment 1960.00 1961.00 0
2004-01-06 Cement Squeeze 1960.00 1961.00 0
2004-01-09 Perforation 1976.50 1979.00 17
2013-03-30 Packing Device Capped w/Cement 1972.80 1973.20 0
1961-06-20 Bullet Perforation 2264.70 2265.00 13
1961-06-22 Cement Squeeze 2264.70 2265.00 0
1961-06-24 Perforation 2259.50 2261.90 7
1961-06-25 Acid Treatment 2259.50 2261.90 0
1977-02-18 Acid Treatment 2259.50 2261.90 0
1984-09-25 Perforation 2255.20 2257.90 13
1984-09-27 Acid Treatment 2255.20 2257.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7883 0.0 0.0 0.0
1968 6763 0.0 0.0 0.0
1969 8390 0.0 0.0 0.0
1970 3538 0.0 0.0 0.0
1971 6257 0.0 0.0 0.0
1972 8514 0.0 0.0 0.0
1973 6742 0.0 0.0 0.0
1974 7299 0.0 0.0 0.0
1975 6759 0.0 0.0 0.0
1976 8594 0.0 0.0 0.0
1977 7653 0.0 0.0 0.0
1978 8504 0.0 0.0 0.0
1979 8626 0.0 0.0 0.0
1980 8452 0.0 0.0 0.0
1981 8653 0.0 0.0 0.0
1982 8036 0.0 0.0 0.0
1983 8561 0.0 0.0 0.0
1984 7838 0.0 0.0 0.0
1985 8113 0.0 0.0 0.0
1986 8206 0.0 0.0 0.0
1987 7986 0.0 0.0 0.0
1988 7814 0.0 0.0 0.0
1989 8073 0.0 0.0 0.0
1990 7724 0.0 0.0 0.0
1991 8114 0.0 0.0 0.0
1992 8293 0.0 0.0 0.0
1993 8101 0.0 0.0 0.0
1994 6117 0.0 0.0 0.0
1995 7663 0.0 0.0 0.0
1996 7419 0.0 0.0 0.0
1997 5605 0.0 0.0 0.0
1998 6139 0.0 0.0 0.0
1999 8439 0.0 0.0 0.0
2000 8431 0.0 0.0 0.0
2001 8302 0.0 0.0 0.0
2002 2505 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References