If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0375031808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.182229,"lon":-114.413981,"icon":""}]} |
| Location: 00/08-18-037-03W5/0 | |
| Location Alias: 00/08-18-37-03 W5M | |
| Location Alias 2: 00/08-18-037-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 18 | |
| County/Municipality: Red Deer County | |
| Well Name: NAL HZ SYLAKE 8-18-37-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0403110 | |
| License Date: 2008-10-31 | |
| License Status: Issued | |
| Spud Date: 2008-11-18 | |
| Final Drill Date: 2008-11-30 | |
| Well Total Depth: 2385.00 m | |
| Surface Hole Latitude: 52.182229 | |
| Surface Hole Longitude: -114.413981 |
| Date | Event |
|---|---|
| 2008-10-31 | Obtained License |
| 2008-11-19 | Surface Casing Operation Performed |
| 2008-11-22 | Direction Drilling Operation Performed - Horizontal |
| 2008-11-25 | Intermediate Casing Operation Performed |
| 2008-11-29 | Liner Casing Operation Performed |
| 2008-11-30 | Finished Drilling |
| 2008-11-30 | Perforation Treatment Performed - Open-Hole Completion |
| 2008-11-30 | Rig Released |
| 2008-11-30 | Well Mode changed to Drilled and Cased |
| 2008-12-11 | Well Log Performed |
| 2008-12-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2008-12-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2009-01-01 | Well Began Production |
| 2009-01-01 | Well Fluid changed to Crude Oil |
| 2009-01-01 | Well Mode changed to Flowing |
| 2009-02-01 | Well Fluid changed to Crude Oil |
| 2009-02-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-11-22 | 1543.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-11-30 | Open Hole/Barefoot Completion | 2380.00 | 2385.00 | 0 |
| 2008-12-19 | Multi-Stage Fracture | 2370.50 | 2370.60 | 0 |
| 2008-12-19 | Multi-Stage Fracture | 2295.20 | 2295.30 | 0 |
| 2008-12-19 | Multi-Stage Fracture | 2210.00 | 2210.10 | 0 |
| 2008-12-19 | Multi-Stage Fracture | 2125.00 | 2125.10 | 0 |
| 2008-12-30 | Multi-Stage Fracture | 2039.00 | 2039.10 | 0 |
| 2008-12-30 | Multi-Stage Fracture | 1955.80 | 1955.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 6658 | 0.0 | 0.0 | 0.0 |
| 2010 | 8660 | 0.0 | 0.0 | 0.0 |
| 2011 | 7379 | 0.0 | 0.0 | 0.0 |
| 2012 | 8748 | 0.0 | 0.0 | 0.0 |
| 2013 | 8524 | 0.0 | 0.0 | 0.0 |
| 2014 | 8664 | 0.0 | 0.0 | 0.0 |
| 2015 | 8483 | 0.0 | 0.0 | 0.0 |
| 2016 | 7589 | 0.0 | 0.0 | 0.0 |
| 2017 | 6966 | 0.0 | 0.0 | 0.0 |
| 2018 | 8749 | 0.0 | 0.0 | 0.0 |
| 2019 | 8637 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]