X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032306000

Well Details

Well ID: 0375032306000
Loading map...
Location: 00/06-23-037-03W5/0
Location Alias: 00/06-23-37-03 W5M
Location Alias 2: 00/06-23-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 23
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 6-23-37-3
Operator Name: NAL Resources Limited
License Number: 0020052
License Date: 1960-11-28
License Status: Issued
Spud Date: 1960-12-01
Final Drill Date: 1960-12-31
Well Total Depth: 2286.00 m
Surface Hole Latitude: 52.193531
Surface Hole Longitude: -114.325970

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-11-28 Obtained License
1960-12-23 Drill Stem Test Performed
1960-12-28 Drill Stem Test Performed
1960-12-30 Drill Stem Test Performed
1960-12-31 Finished Drilling
1961-01-01 Drill Stem Test Performed
1961-01-02 Drill Stem Test Performed
1961-01-03 Production Casing Operation Performed
1961-01-09 Perforation Treatment Performed - Bullet Perforation
1961-01-14 Perforation Treatment Performed - Acid Wash - No Pressure
1961-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-01-20 Perforation Treatment Performed - Cement Squeeze
1961-01-21 Perforation Treatment Performed - Cement Squeeze
1961-01-23 Perforation Treatment Performed - Jet Perforation
1961-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-26 Perforation Treatment Performed - Fractured
1961-01-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-01-31 Perforation Treatment Performed - Cement Squeeze
1961-02-02 Perforation Treatment Performed - Jet Perforation
1961-02-03 Perforation Treatment Performed - Cement Squeeze
1961-02-05 Perforation Treatment Performed - Cement Squeeze
1961-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-07 Perforation Treatment Performed - Jet Perforation
1961-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-08 Perforation Treatment Performed - Fractured
1961-04-05 Well Mode changed to Drilled and Cased
1965-03-07 Perforation Treatment Performed - Bullet Perforation
1965-03-08 Perforation Treatment Performed - Cement Squeeze
1965-03-11 Perforation Treatment Performed - Cement Squeeze
1965-03-12 Perforation Treatment Performed - Cement Squeeze
1965-03-12 Well Mode changed to Abandoned Zone
1965-03-20 Perforation Treatment Performed - Bullet Perforation
1965-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1965-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-28 Perforation Treatment Performed - Cement Squeeze
1970-11-02 Perforation Treatment Performed - Acid Wash - No Pressure
1970-11-02 Perforation Treatment Performed - Jet Perforation
1970-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1988-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-14 Well Log Performed
1996-01-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-01-09 Bullet Perforation 2247.30 2254.00 13
1961-01-26 Acid Treatment 1691.30 1695.00 0
1961-01-26 Fracture 1691.30 1695.00 0
1961-01-30 Hydra Jet Perforation 914.40 914.40 0
1961-01-31 Cement Squeeze 914.40 914.40 0
1961-02-02 Perforation 887.60 894.00 13
1961-02-03 Cement Squeeze 887.60 894.00 0
1961-02-05 Cement Squeeze 887.60 894.00 0
1961-02-06 Acid Treatment 887.60 894.00 0
1961-02-07 Perforation 887.60 894.00 0
1961-02-08 Acid Treatment 887.60 894.00 0
1961-01-14 Acid Wash 2247.30 2254.00 0
1961-02-08 Fracture 887.60 894.00 0
1965-03-07 Bullet Perforation 2264.10 2265.60 13
1965-03-07 Bullet Perforation 2267.40 2270.80 13
1965-03-08 Cement Squeeze 2247.30 2270.80 0
1965-03-11 Cement Squeeze 1691.30 1695.00 0
1965-03-12 Cement Squeeze 887.60 894.00 0
1965-03-20 Bullet Perforation 2268.90 2270.80 13
1965-03-20 Bullet Perforation 2267.40 2268.90 13
1965-03-20 Bullet Perforation 2264.10 2265.90 13
1965-03-21 Acid Wash 2264.10 2270.80 0
1961-01-15 Acid Treatment 2247.30 2254.00 0
1965-03-21 Acid Treatment 2264.10 2270.80 0
1965-03-24 Acid Treatment 2264.10 2270.80 0
1970-10-27 Acid Treatment 2264.10 2270.80 0
1970-10-28 Cement Squeeze 2247.30 2270.80 0
1970-11-02 Perforation 2264.10 2265.60 13
1970-11-02 Perforation 2267.40 2270.80 13
1970-11-02 Acid Wash 2264.10 2270.80 0
1970-11-03 Acid Treatment 2264.10 2270.80 0
1980-08-14 Acid Treatment 2264.10 2270.80 0
1987-10-27 Acid Wash 2264.10 2270.80 0
1961-01-17 Acid Treatment 2247.30 2254.00 0
1988-10-06 Acid Treatment 2264.10 2270.80 0
1961-01-20 Hydra Jet Perforation 1676.40 1676.40 0
1961-01-20 Hydra Jet Perforation 1706.90 1706.90 0
1961-01-20 Cement Squeeze 1676.40 1706.90 0
1961-01-21 Cement Squeeze 1676.40 1706.90 0
1961-01-23 Perforation 1691.30 1695.00 13

For data sources see[4]



References