X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032312002

Well Details

Well ID: 0375032312002
Loading map...
Location: 00/12-23-037-03W5/2
Location Alias: 00/12-23-37-03 W5M
Location Alias 2: 00/12-23-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 23
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 12-23-37-3
Operator Name: NAL Resources Limited
License Number: 0196752
License Date: 1997-01-15
License Status: Issued
Spud Date: 1997-01-22
Final Drill Date: 1997-01-30
Well Total Depth: 2298.00 m
Surface Hole Latitude: 52.198475
Surface Hole Longitude: -114.331603

For data sources see[1][2]

Well History

Date Event
1997-01-03 Well Log Performed
1997-01-15 Obtained License
1997-01-22 Well Log Performed
1997-01-23 Surface Casing Operation Performed
1997-01-30 Finished Drilling
1997-01-30 Well Mode changed to Drilled and Cased
1997-01-31 Well Log Performed
1997-02-02 Production Casing Operation Performed
1997-02-02 Rig Released
1997-02-15 Well Log Performed
1997-02-16 Perforation Treatment Performed - Jet Perforation
1997-02-28 Well Log Performed
1997-03-04 Perforation Treatment Performed - Jet Perforation
1997-11-08 Well Began Production
1997-11-08 Well Fluid changed to Gas
1997-11-08 Well Mode changed to Flowing
1998-03-10 Well Log Performed
1998-03-11 Perforation Treatment Performed - Jet Perforation
1999-04-26 Perforation Treatment Performed - Cement Squeeze
1999-04-26 Plug Back Performed
1999-04-26 Well Fluid changed to Gas
1999-04-26 Well Mode changed to Abandoned Zone
1999-05-04 Perforation Treatment Performed - Jet Perforation
1999-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-16 Perforation 2182.00 2183.50 13
1997-03-04 Perforation 2232.50 2235.50 14
1997-03-04 Perforation 2236.50 2239.00 14
1997-03-04 Perforation 2242.00 2243.50 14
1998-03-11 Perforation 2178.00 2182.00 18
1998-03-11 Perforation 2183.50 2187.00 18
1999-04-26 Cement Squeeze 2178.00 2187.00 0
1999-05-04 Perforation 2233.00 2243.50 14
1999-05-06 Acid Treatment 2232.50 2243.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 936 0.0 0.0 0.0
1998 7161 0.0 0.0 0.0
1999 2027 0.0 0.0 0.0

For data sources see[5]

References