X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032413000

Well Details

Well ID: 0375032413000
Loading map...
Location: 00/13-24-037-03W5/0
Location Alias: 00/13-24-37-03 W5M
Location Alias 2: 00/13-24-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 24
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 13-24-37-3
Operator Name: NAL Resources Limited
License Number: 0270819
License Date: 2002-06-12
License Status: Amended
Spud Date: 2002-06-24
Final Drill Date: 2002-07-02
Well Total Depth: 2235.00 m
Surface Hole Latitude: 52.199744
Surface Hole Longitude: -114.306847

For data sources see[1][2]

Well History

Date Event
2002-06-12 Obtained License
2002-06-26 Surface Casing Operation Performed
2002-07-02 Finished Drilling
2002-07-02 Well Log Performed
2002-07-03 Production Casing Operation Performed
2002-07-03 Rig Released
2002-07-03 Well Mode changed to Drilled and Cased
2002-07-30 Perforation Treatment Performed - Jet Perforation
2002-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-16 Well Began Production
2002-08-16 Well Fluid changed to Crude Oil
2002-08-16 Well Mode changed to Pumping
2003-04-30 Well Fluid changed to Crude Oil
2003-04-30 Well Mode changed to Suspended
2004-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-25 Plug Back Performed
2004-09-25 Well Fluid changed to Crude Oil
2004-09-25 Well Log Performed
2004-09-25 Well Mode changed to Abandoned Zone
2004-09-28 Well Log Performed
2004-11-04 Perforation Treatment Performed - Jet Perforation
2004-11-04 Well Log Performed
2004-11-05 Perforation Treatment Performed - Jet Perforation
2004-11-05 Well Log Performed
2004-11-09 Perforation Treatment Performed - Remedial Casing
2004-11-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-11-16 Perforation Treatment Performed - Remedial Casing
2004-11-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2004-11-19 Perforation Treatment Performed - Remedial Casing
2004-11-23 Well Log Performed
2004-11-30 Perforation Treatment Performed - Jet Perforation
2004-11-30 Well Log Performed
2004-12-07 Perforation Treatment Performed - Fractured
2005-01-07 Perforation Treatment Performed - Jet Perforation
2005-01-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-30 Perforation 2203.00 2211.00 13
2004-11-19 Remedial Casing Cementing 175.00 176.00 0
2004-11-30 Perforation 805.00 807.00 17
2004-11-30 Perforation 801.00 803.50 17
2004-11-30 Perforation 681.00 684.00 17
2004-12-07 Fracture 801.00 807.00 0
2004-12-07 Fracture 681.00 684.00 0
2005-01-07 Perforation 487.00 490.00 17
2005-01-09 Fracture 487.00 490.00 0
2002-07-31 Acid Treatment 2203.00 2211.00 0
2004-09-25 Packing Device Capped w/Cement 2191.00 2199.00 0
2004-11-04 Perforation 349.00 352.00 13
2004-11-05 Perforation 332.00 335.00 13
2004-11-09 Remedial Casing Cementing 332.00 352.00 0
2004-11-16 Hydra Jet Perforation 321.00 322.00 1
2004-11-16 Remedial Casing Cementing 321.00 322.00 0
2004-11-19 Hydra Jet Perforation 175.00 176.00 1

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2702 0.0 0.0 0.0
2003 2278 0.0 0.0 0.0

For data sources see[5]

References