| Well ID: 0375032604002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.20325,"lon":-114.330403,"icon":""}]} |
| Location: 00/04-26-037-03W5/2 | |
| Location Alias: 00/04-26-37-03 W5M | |
| Location Alias 2: 00/04-26-037-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 26 | |
| County/Municipality: Red Deer County | |
| Well Name: NAL HZ GU#1 SYLAKE 4-26-37-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0203830 | |
| License Date: 1997-07-23 | |
| License Status: Amended | |
| Spud Date: 1997-07-23 | |
| Final Drill Date: 1997-08-29 | |
| Well Total Depth: 2367.00 m | |
| Surface Hole Latitude: 52.203250 | |
| Surface Hole Longitude: -114.330403 |
| Date | Event |
|---|---|
| 1997-07-23 | Obtained License |
| 1997-08-05 | Direction Drilling Operation Performed - Horizontal |
| 1997-08-27 | Direction Drilling Operation Performed - Horizontal |
| 1997-08-28 | Well Log Performed |
| 1997-08-29 | Finished Drilling |
| 1997-08-29 | Perforation Treatment Performed - Open-Hole Completion |
| 1997-08-31 | Perforation Treatment Performed - Cement Plug |
| 1997-08-31 | Plug Back Performed |
| 1997-09-04 | Rig Released |
| 1997-09-04 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1997-08-05 | 2105.00 | Horizontal |
| 1997-08-27 | 2242.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-08-29 | Open Hole/Barefoot Completion | 2235.00 | 2367.00 | 0 |
| 1997-08-31 | Cement Plug | 2240.00 | 2367.00 | 0 |
For data sources see[5]