X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032802000

Well Details

Well ID: 0375032802000
Loading map...
Location: 00/02-28-037-03W5/0
Location Alias: 00/02-28-37-03 W5M
Location Alias 2: 00/02-28-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 28
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 2-28-37-3
Operator Name: NAL Resources Limited
License Number: 0028975
License Date: 1965-09-16
License Status: Suspension
Spud Date: 1965-10-03
Final Drill Date: 1965-10-17
Well Total Depth: 2284.50 m
Surface Hole Latitude: 52.205047
Surface Hole Longitude: -114.368473

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-16 Obtained License
1965-10-16 Drill Stem Test Performed
1965-10-17 Finished Drilling
1965-10-17 Well Mode changed to Drilled and Cased
1965-10-18 Drill Stem Test Performed
1965-10-20 Production Casing Operation Performed
1965-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-21 Perforation Treatment Performed - Bullet Perforation
1965-11-01 Perforation Treatment Performed - Cement Squeeze
1965-11-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-10 Well Began Production
1965-12-10 Well Fluid changed to Crude Oil
1965-12-10 Well Mode changed to Pumping
1983-06-17 Perforation Treatment Performed - Fractured
1983-06-17 Perforation Treatment Performed - Jet Perforation
1983-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-22 Perforation Treatment Performed - Jet Perforation
1983-06-22 Well Fluid changed to Crude Oil
1983-06-22 Well Mode changed to Pumping
1983-06-27 Perforation Treatment Performed - Fractured
1984-06-29 Well Fluid changed to Crude Oil
1984-06-29 Well Mode changed to Suspended
1985-07-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-10-21 Bullet Perforation 2244.20 2245.80 7
1983-06-22 Acid Treatment 2207.90 2209.80 0
1983-06-27 Fracture 2207.90 2209.80 0
1965-10-21 Acid Treatment 2244.20 2245.80 0
1965-11-01 Cement Squeeze 2244.20 2245.80 0
1965-11-04 Hydra Jet Perforation 2244.20 2245.80 0
1965-11-05 Acid Treatment 2244.20 2245.80 0
1983-06-17 Perforation 2221.90 2227.00 13
1983-06-17 Perforation 2216.80 2217.80 0
1983-06-17 Fracture 2216.80 2227.00 0
1983-06-22 Perforation 2207.90 2209.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5915 0.0 0.0 0.0
1968 6570 0.0 0.0 0.0
1969 6239 0.0 0.0 0.0
1970 7205 0.0 0.0 0.0
1971 7843 0.0 0.0 0.0
1972 7522 0.0 0.0 0.0
1973 6453 0.0 0.0 0.0
1974 3731 0.0 0.0 0.0
1975 2421 0.0 0.0 0.0
1976 6846 0.0 0.0 0.0
1977 7610 0.0 0.0 0.0
1978 7525 0.0 0.0 0.0
1979 7710 0.0 0.0 0.0
1980 2960 0.0 0.0 0.0
1981 7284 0.0 0.0 0.0
1982 7037 0.0 0.0 0.0
1983 2334 0.0 0.0 0.0

For data sources see[5]

References