X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032915002

Well Details

Well ID: 0375032915002
Loading map...
Location: 00/15-29-037-03W5/2
Location Alias: 00/15-29-37-03 W5M
Location Alias 2: 00/15-29-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 29
County/Municipality: Red Deer County
Well Name: NAL ET AL SYLVAN LAKE 15-29-37-3
Operator Name: NAL Resources Limited
License Number: 0169214
License Date: 1994-08-03
License Status: Suspension
Spud Date: 1994-08-12
Final Drill Date: 1994-08-26
Well Total Depth: 2320.00 m
Surface Hole Latitude: 52.216145
Surface Hole Longitude: -114.390167

For data sources see[1][2]

Well History

Date Event
1994-08-03 Obtained License
1994-08-12 Well Log Performed
1994-08-13 Surface Casing Operation Performed
1994-08-26 Finished Drilling
1994-08-26 Well Log Performed
1994-08-26 Well Mode changed to Drilled and Cased
1994-08-30 Well Log Performed
1994-08-31 Production Casing Operation Performed
1994-08-31 Rig Released
1994-09-14 Well Log Performed
1994-09-15 Perforation Treatment Performed - Jet Perforation
1994-09-15 Well Log Performed
1994-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-30 Plug Back Performed
2007-11-02 Perforation Treatment Performed - Jet Perforation
2007-11-02 Well Log Performed
2007-11-05 Perforation Treatment Performed - Fractured
2007-11-13 Well Fluid changed to Gas
2007-11-13 Well Mode changed to Testing
2008-02-15 Well Began Production
2008-02-15 Well Fluid changed to Gas
2008-02-15 Well Mode changed to Pumping
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-15 Perforation 2254.50 2256.00 7
1994-09-17 Acid Treatment 2254.50 2256.00 0
2007-10-30 Packing Device Capped w/Cement 2242.10 2250.10 0
2007-11-02 Perforation 2193.50 2197.50 17
2007-11-05 Fracture 2193.50 2197.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 28 0.0 0.0 0.0
2008 1088 0.0 0.0 0.0

For data sources see[5]

References