X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032916002

Well Details

Well ID: 0375032916002
Loading map...
Location: 00/16-29-037-03W5/2
Location Alias: 00/16-29-37-03 W5M
Location Alias 2: 00/16-29-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 29
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 16-29MU-37-3
Operator Name: NAL Resources Limited
License Number: 0006706
License Date: 1953-07-07
License Status: Suspension
Spud Date: 1953-07-21
Final Drill Date: 1953-10-17
Well Total Depth: 2880.10 m
Surface Hole Latitude: 52.215415
Surface Hole Longitude: -114.385616

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-07 Obtained License
1953-08-22 Drill Stem Test Performed
1953-08-23 Drill Stem Test Performed
1953-08-24 Drill Stem Test Performed
1953-08-26 Drill Stem Test Performed
1953-08-27 Drill Stem Test Performed
1953-08-28 Drill Stem Test Performed
1953-09-01 Drill Stem Test Performed
1953-10-07 Drill Stem Test Performed
1953-10-08 Drill Stem Test Performed
1953-10-17 Finished Drilling
1953-10-17 Well Mode changed to Drilled and Cased
1953-10-21 Drill Stem Test Performed
1953-11-12 Liner Casing Operation Performed
1953-11-15 Perforation Treatment Performed - Bullet Perforation
1953-11-15 Perforation Treatment Performed - Jet Perforation
1963-09-25 Perforation Treatment Performed - Acid Wash - No Pressure
1963-09-25 Perforation Treatment Performed - Open-Hole Completion
1963-10-02 Perforation Treatment Performed - Cement Squeeze
1964-07-15 Perforation Treatment Performed - Jet Perforation
1964-07-16 Perforation Treatment Performed - Acid Wash - No Pressure
1964-11-19 Well Began Production
1964-11-19 Well Fluid changed to Crude Oil
1964-11-19 Well Mode changed to Flowing
1965-03-03 Well Fluid changed to Crude Oil
1965-03-03 Well Mode changed to Pumping
1967-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-12 Well Log Performed
1993-11-13 Perforation Treatment Performed - Cement Squeeze
1993-11-13 Plug Back Performed
1993-11-13 Well Fluid changed to Crude Oil
1993-11-13 Well Mode changed to Pumping
1993-11-19 Perforation Treatment Performed - Jet Perforation
1993-11-19 Well Log Performed
1993-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-06 Plug Back Performed
2001-03-06 Well Fluid changed to Crude Oil
2001-03-06 Well Log Performed
2001-03-06 Well Mode changed to Abandoned Zone
2001-03-09 Perforation Treatment Performed - Jet Perforation
2001-03-09 Well Log Performed
2001-06-01 Perforation Treatment Performed - Fractured
2001-06-08 Well Log Performed
2001-09-01 Well Fluid changed to Crude Oil
2001-09-01 Well Mode changed to Flowing
2001-09-02 Well Fluid changed to Crude Oil
2001-09-02 Well Mode changed to Suspended
2006-03-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-15 Bullet Perforation 2194.60 2198.50 13
1993-11-13 Cement Squeeze 2194.60 2198.50 0
1993-11-19 Perforation 2246.30 2250.60 13
1993-11-20 Acid Treatment 2246.30 2250.60 0
2001-03-06 Packing Device Capped w/Cement 2241.00 2249.00 0
2001-03-09 Perforation 2194.50 2204.00 17
2001-06-01 Fracture 2194.50 2204.00 0
1953-11-15 Perforation 2194.60 2198.50 7
1963-09-25 Open Hole/Barefoot Completion 2230.80 2257.00 0
1963-09-25 Acid Wash 2230.80 2257.00 0
1963-10-02 Cement Squeeze 2230.80 2257.00 0
1964-07-15 Perforation 2249.70 2250.30 13
1964-07-16 Acid Wash 2249.70 2250.30 0
1967-12-19 Acid Treatment 2249.70 2250.30 0
1987-10-21 Acid Treatment 2249.70 2250.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6315 0.0 0.0 0.0
1968 5806 0.0 0.0 0.0
1969 5228 0.0 0.0 0.0
1970 7392 0.0 0.0 0.0
1971 7832 0.0 0.0 0.0
1972 7534 0.0 0.0 0.0
1973 8247 0.0 0.0 0.0
1974 8357 0.0 0.0 0.0
1975 7589 0.0 0.0 0.0
1976 7413 0.0 0.0 0.0
1977 6863 0.0 0.0 0.0
1978 7198 0.0 0.0 0.0
1979 6619 0.0 0.0 0.0
1980 8428 0.0 0.0 0.0
1981 8108 0.0 0.0 0.0
1982 7261 0.0 0.0 0.0
1983 8541 0.0 0.0 0.0
1984 8627 0.0 0.0 0.0
1985 7901 0.0 0.0 0.0
1986 8129 0.0 0.0 0.0
1987 7114 0.0 0.0 0.0
1988 7415 0.0 0.0 0.0
1989 7275 0.0 0.0 0.0
1990 8351 0.0 0.0 0.0
1991 8422 0.0 0.0 0.0
1992 8591 0.0 0.0 0.0
1993 6945 0.0 0.0 0.0
1994 6373 0.0 0.0 0.0
1995 8667 0.0 0.0 0.0
1996 8432 0.0 0.0 0.0
1997 7574 0.0 0.0 0.0
1998 5452 0.0 0.0 0.0
1999 8347 0.0 0.0 0.0
2000 8409 0.0 0.0 0.0
2001 2424 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-03-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References