X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033004002

Well Details

Well ID: 0375033004002
Loading map...
Location: 00/04-30-037-03W5/2
Location Alias: 00/04-30-37-03 W5M
Location Alias 2: 00/04-30-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 30
County/Municipality: Red Deer County
Well Name: NAL ACE SYLAKE 4-30-37-3
Operator Name: NAL Resources Limited
License Number: 0023276
License Date: 1962-11-05
License Status: Suspension
Spud Date: 1962-11-30
Final Drill Date: 1962-12-23
Well Total Depth: 2322.00 m
Surface Hole Latitude: 52.204552
Surface Hole Longitude: -114.427008

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-05 Obtained License
1962-12-17 Drill Stem Test Performed
1962-12-19 Drill Stem Test Performed
1962-12-22 Drill Stem Test Performed
1962-12-23 Finished Drilling
1962-12-23 Well Mode changed to Drilled and Cased
1962-12-25 Drill Stem Test Performed
1962-12-28 Production Casing Operation Performed
1963-05-16 Perforation Treatment Performed - Jet Perforation
1963-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-17 Perforation Treatment Performed - Acid Wash - No Pressure
1963-05-18 Perforation Treatment Performed - Fractured
1964-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-09-29 Perforation Treatment Performed - Jet Perforation
1964-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-30 Perforation Treatment Performed - Cement Squeeze
1964-10-05 Perforation Treatment Performed - Jet Perforation
1964-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-15 Perforation Treatment Performed - Fractured
1964-11-02 Well Began Production
1964-11-02 Well Fluid changed to Crude Oil
1964-11-02 Well Mode changed to Pumping
2017-08-01 Well Fluid changed to Crude Oil
2017-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-16 Perforation 2280.50 2281.40 26
1964-10-15 Acid Treatment 1753.80 1755.00 0
1964-10-15 Fracture 1753.80 1755.00 0
1963-05-17 Acid Wash 2280.50 2281.40 0
1963-05-17 Acid Treatment 2280.50 2281.40 0
1963-05-18 Fracture 2280.50 2281.40 0
1964-09-29 Packing Device Capped w/Cement 1770.90 1770.90 0
1964-09-29 Perforation 1761.70 1762.00 16
1964-09-30 Acid Treatment 1761.70 1762.00 0
1964-09-30 Cement Squeeze 1761.70 1762.00 0
1964-10-05 Perforation 1753.80 1755.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5297 0.0 0.0 0.0
1968 6970 0.0 0.0 0.0
1969 7031 0.0 0.0 0.0
1970 5180 0.0 0.0 0.0
1971 3600 0.0 0.0 0.0
1972 2873 0.0 0.0 0.0
1973 4866 0.0 0.0 0.0
1974 8062 0.0 0.0 0.0
1975 7327 0.0 0.0 0.0
1976 6993 0.0 0.0 0.0
1977 7459 0.0 0.0 0.0
1978 7714 0.0 0.0 0.0
1979 7767 0.0 0.0 0.0
1980 7810 0.0 0.0 0.0
1981 6793 0.0 0.0 0.0
1982 7669 0.0 0.0 0.0
1983 7434 0.0 0.0 0.0
1984 7802 0.0 0.0 0.0
1985 7810 0.0 0.0 0.0
1986 7357 0.0 0.0 0.0
1987 8341 0.0 0.0 0.0
1988 7923 0.0 0.0 0.0
1989 8414 0.0 0.0 0.0
1990 8665 0.0 0.0 0.0
1991 8224 0.0 0.0 0.0
1992 8765 0.0 0.0 0.0
1993 8669 0.0 0.0 0.0
1994 8234 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8416 0.0 0.0 0.0
1997 8492 0.0 0.0 0.0
1998 7704 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8395 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 8607 0.0 0.0 0.0
2006 8683 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8635 0.0 0.0 0.0
2009 8255 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 6407 0.0 0.0 0.0
2014 8728 0.0 0.0 0.0
2015 7715 0.0 0.0 0.0
2016 7941 0.0 0.0 0.0
2017 2711 0.0 0.0 0.0

For data sources see[5]

References