X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033216000

Well Details

Well ID: 0375033216000
Loading map...
Location: 00/16-32-037-03W5/0
Location Alias: 00/16-32-37-03 W5M
Location Alias 2: 00/16-32-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 32
County/Municipality: Red Deer County
Well Name: NAL SYLVAN LAKE 16-32-37-3
Operator Name: NAL Resources Limited
License Number: 0159256
License Date: 1993-06-18
License Status: Suspension
Spud Date: 1993-06-28
Final Drill Date: 1993-07-08
Well Total Depth: 2310.00 m
Surface Hole Latitude: 52.229426
Surface Hole Longitude: -114.384869

For data sources see[1][2]

Well History

Date Event
1993-06-18 Obtained License
1993-06-29 Surface Casing Operation Performed
1993-07-03 Direction Drilling Operation Performed - Deviate
1993-07-08 Finished Drilling
1993-07-08 Well Log Performed
1993-07-08 Well Mode changed to Drilled and Cased
1993-07-09 Well Log Performed
1993-07-10 Production Casing Operation Performed
1993-07-10 Rig Released
1993-07-16 Perforation Treatment Performed - Jet Perforation
1993-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-21 Perforation Treatment Performed - Jet Perforation
1993-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-27 Perforation Treatment Performed - Cement Squeeze
1993-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-29 Perforation Treatment Performed - Jet Perforation
1993-09-08 Well Log Performed
1993-10-01 Well Began Production
1993-10-01 Well Fluid changed to Crude Oil
1993-10-01 Well Mode changed to Flowing
1993-11-09 Perforation Treatment Performed - Cement Squeeze
1993-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-11 Perforation Treatment Performed - Jet Perforation
1994-01-19 Perforation Treatment Performed - Cement Squeeze
1994-01-20 Perforation Treatment Performed - Jet Perforation
1994-01-20 Well Log Performed
1994-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-22 Perforation Treatment Performed - Jet Perforation
1996-05-22 Well Log Performed
1996-05-23 Well Log Performed
1996-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-28 Perforation Treatment Performed - Jet Perforation
1996-05-28 Well Log Performed
1996-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-29 Perforation Treatment Performed - Cement Squeeze
1996-06-01 Perforation Treatment Performed - Selective Jet Perforations
1997-03-19 Well Log Performed
1997-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-14 Plug Back Performed
1997-05-14 Well Fluid changed to Crude Oil
1997-05-14 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-07-03 1750.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-16 Perforation 2268.00 2269.00 18
1993-11-11 Perforation 2256.00 2258.00 18
1993-11-11 Acid Treatment 2256.00 2258.00 0
1994-01-19 Cement Squeeze 2256.00 2258.00 0
1994-01-20 Perforation 2245.00 2247.50 18
1994-01-20 Perforation 2250.00 2251.00 18
1994-01-21 Acid Treatment 2245.00 2251.00 0
1996-05-22 Perforation 2268.00 2269.00 14
1996-05-22 Acid Treatment 2268.00 2269.00 0
1996-05-28 Acid Treatment 2268.00 2269.00 0
1996-05-28 Perforation 2259.00 2259.50 17
1993-07-19 Acid Treatment 2268.00 2269.00 0
1996-05-29 Acid Treatment 2259.00 2259.50 0
1996-05-29 Cement Squeeze 2245.00 2269.00 0
1996-06-01 Selective Jet Perforations 2249.50 2249.50 0
1996-06-01 Selective Jet Perforations 2251.50 2252.20 0
1996-06-01 Selective Jet Perforations 2254.20 2254.30 0
1996-06-01 Selective Jet Perforations 2256.50 2256.50 0
1997-05-14 Packing Device Capped w/Cement 2240.00 2243.00 0
1993-07-21 Perforation 2261.50 2262.50 18
1993-07-21 Perforation 2265.00 2266.00 18
1993-07-22 Acid Treatment 2261.50 2266.00 0
1993-07-27 Cement Squeeze 2261.50 2269.00 0
1993-07-29 Perforation 2259.50 2261.00 17
1993-07-29 Acid Treatment 2259.50 2261.00 0
1993-11-09 Cement Squeeze 2259.50 2261.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1723 0.0 0.0 0.0
1994 436 0.0 0.0 0.0
1996 2213 0.0 0.0 0.0

For data sources see[6]

References