X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033315000

Well Details

Well ID: 0375033315000
Loading map...
Location: 00/15-33-037-03W5/0
Location Alias: 00/15-33-37-03 W5M
Location Alias 2: 00/15-33-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 33
County/Municipality: Red Deer County
Well Name: NAL GU#1 SYLAKE 15-33-37-3
Operator Name: NAL Resources Limited
License Number: 0141915
License Date: 1989-11-29
License Status: Issued
Spud Date: 1989-12-02
Final Drill Date: 1989-12-12
Well Total Depth: 2265.00 m
Surface Hole Latitude: 52.229451
Surface Hole Longitude: -114.366945

For data sources see[1][2]

Well History

Date Event
1989-11-29 Obtained License
1989-12-03 Surface Casing Operation Performed
1989-12-12 Finished Drilling
1989-12-12 Well Mode changed to Drilled and Cased
1989-12-13 Well Log Performed
1989-12-14 Drill Stem Test Performed
1989-12-15 Drill Stem Test Performed
1989-12-16 Drill Stem Test Performed
1989-12-18 Production Casing Operation Performed
1989-12-19 Rig Released
1990-01-10 Well Log Performed
1990-01-11 Perforation Treatment Performed - Jet Perforation
1990-01-11 Well Began Production
1990-01-11 Well Fluid changed to Crude Oil
1990-01-11 Well Mode changed to Flowing
1990-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-03 Perforation Treatment Performed - Jet Perforation
1990-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-02 Well Fluid changed to Crude Oil
1990-08-02 Well Mode changed to Pumping
1991-05-11 Perforation Treatment Performed - Jet Perforation
1991-05-16 Perforation Treatment Performed - Cement Squeeze
1991-05-22 Perforation Treatment Performed - Jet Perforation
1991-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-30 Perforation Treatment Performed - Cement Squeeze
1991-06-01 Perforation Treatment Performed - Jet Perforation
1991-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-08 Perforation Treatment Performed - Cement Squeeze
1991-06-13 Perforation Treatment Performed - Jet Perforation
1991-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-23 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-30 Perforation Treatment Performed - Cement Squeeze
1994-03-30 Well Fluid changed to Crude Oil
1994-03-30 Well Log Performed
1994-03-30 Well Mode changed to Abandoned Zone
1994-03-31 Perforation Treatment Performed - Jet Perforation
1994-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-03 Perforation Treatment Performed - Cement Plug
1994-06-03 Perforation Treatment Performed - Cement Squeeze
1994-06-06 Well Log Performed
1994-06-07 Perforation Treatment Performed - Jet Perforation
1994-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-06 Perforation Treatment Performed - Jet Perforation
1996-06-06 Well Log Performed
1996-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-11 Perforation 2207.00 2208.00 13
1991-05-23 Acid Treatment 2201.50 2207.20 0
1991-05-30 Cement Squeeze 2201.50 2207.20 0
1991-06-01 Perforation 2201.00 2206.00 18
1991-06-04 Acid Treatment 2201.00 2206.00 0
1991-06-08 Cement Squeeze 2201.00 2206.00 0
1991-06-13 Perforation 2201.00 2205.00 18
1991-06-13 Perforation 2209.00 2210.00 18
1991-06-14 Acid Treatment 2201.00 2210.00 0
1994-03-24 Perforation 2189.00 2192.00 18
1994-03-24 Perforation 2196.00 2197.00 18
1990-01-12 Acid Treatment 2207.00 2208.00 0
1994-03-25 Acid Treatment 2189.00 2197.00 0
1994-03-30 Cement Squeeze 2201.00 2210.00 0
1994-03-31 Perforation 2189.00 2192.00 18
1994-04-01 Acid Treatment 2189.00 2192.00 0
1994-04-05 Acid Treatment 2189.00 2192.00 0
1994-06-03 Cement Squeeze 2186.00 2197.00 0
1994-06-03 Cement Plug 2186.00 2200.00 0
1994-06-07 Perforation 2168.00 2169.00 16
1994-06-07 Perforation 2170.50 2172.00 16
1994-06-07 Perforation 2173.50 2175.50 16
1990-01-23 Acid Treatment 2207.00 2208.00 0
1994-06-07 Perforation 2177.00 2178.00 16
1994-06-08 Acid Treatment 2168.00 2169.00 0
1996-06-06 Perforation 2164.00 2166.50 17
1996-06-06 Perforation 2160.00 2163.00 17
1996-06-07 Acid Treatment 2160.00 2178.00 0
1990-02-03 Perforation 2205.40 2207.20 13
1990-02-06 Acid Treatment 2205.40 2208.00 0
1991-05-11 Perforation 2209.50 2210.50 18
1991-05-16 Cement Squeeze 2205.40 2210.50 0
1991-05-22 Perforation 2201.50 2202.50 18
1991-05-22 Perforation 2203.50 2207.20 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4815 0.0 0.0 0.0
1991 7351 0.0 0.0 0.0
1992 8483 0.0 0.0 0.0
1993 8647 0.0 0.0 0.0
1994 1792 0.0 0.0 0.0

For data sources see[5]

References