X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033315002

Well Details

Well ID: 0375033315002
Loading map...
Location: 00/15-33-037-03W5/2
Location Alias: 00/15-33-37-03 W5M
Location Alias 2: 00/15-33-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 33
County/Municipality: Red Deer County
Well Name: NAL GU#1 SYLAKE 15-33-37-3
Operator Name: NAL Resources Limited
License Number: 0141915
License Date: 1989-11-29
License Status: Issued
Spud Date: 1989-12-02
Final Drill Date: 1989-12-12
Well Total Depth: 2265.00 m
Surface Hole Latitude: 52.229451
Surface Hole Longitude: -114.366945

For data sources see[1][2]

Well History

Date Event
1989-11-29 Obtained License
1989-12-03 Surface Casing Operation Performed
1989-12-12 Finished Drilling
1989-12-12 Well Mode changed to Drilled and Cased
1989-12-13 Well Log Performed
1989-12-14 Drill Stem Test Performed
1989-12-15 Drill Stem Test Performed
1989-12-16 Drill Stem Test Performed
1989-12-18 Production Casing Operation Performed
1989-12-19 Rig Released
1990-01-10 Well Log Performed
1990-01-11 Perforation Treatment Performed - Jet Perforation
1990-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-03 Perforation Treatment Performed - Jet Perforation
1990-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-11 Perforation Treatment Performed - Jet Perforation
1991-05-16 Perforation Treatment Performed - Cement Squeeze
1991-05-22 Perforation Treatment Performed - Jet Perforation
1991-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-30 Perforation Treatment Performed - Cement Squeeze
1991-06-01 Perforation Treatment Performed - Jet Perforation
1991-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-08 Perforation Treatment Performed - Cement Squeeze
1991-06-13 Perforation Treatment Performed - Jet Perforation
1991-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-23 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-30 Perforation Treatment Performed - Cement Squeeze
1994-03-30 Well Log Performed
1994-03-31 Perforation Treatment Performed - Jet Perforation
1994-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-01 Well Began Production
1994-04-01 Well Fluid changed to Gas
1994-04-01 Well Mode changed to Flowing
1994-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-03 Perforation Treatment Performed - Cement Plug
1994-06-03 Perforation Treatment Performed - Cement Squeeze
1994-06-06 Well Log Performed
1994-06-07 Perforation Treatment Performed - Jet Perforation
1994-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-06 Perforation Treatment Performed - Jet Perforation
1996-06-06 Well Log Performed
1996-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-01-11 Perforation 2207.00 2208.00 13
1991-05-23 Acid Treatment 2201.50 2207.20 0
1991-05-30 Cement Squeeze 2201.50 2207.20 0
1991-06-01 Perforation 2201.00 2206.00 18
1991-06-04 Acid Treatment 2201.00 2206.00 0
1991-06-08 Cement Squeeze 2201.00 2206.00 0
1991-06-13 Perforation 2201.00 2205.00 18
1991-06-13 Perforation 2209.00 2210.00 18
1991-06-14 Acid Treatment 2201.00 2210.00 0
1994-03-24 Perforation 2189.00 2192.00 18
1994-03-24 Perforation 2196.00 2197.00 18
1990-01-12 Acid Treatment 2207.00 2208.00 0
1994-03-25 Acid Treatment 2189.00 2197.00 0
1994-03-30 Cement Squeeze 2201.00 2210.00 0
1994-03-31 Perforation 2189.00 2192.00 18
1994-04-01 Acid Treatment 2189.00 2192.00 0
1994-04-05 Acid Treatment 2189.00 2192.00 0
1994-06-03 Cement Squeeze 2186.00 2197.00 0
1994-06-03 Cement Plug 2186.00 2200.00 0
1994-06-07 Perforation 2168.00 2169.00 16
1994-06-07 Perforation 2170.50 2172.00 16
1994-06-07 Perforation 2173.50 2175.50 16
1990-01-23 Acid Treatment 2207.00 2208.00 0
1994-06-07 Perforation 2177.00 2178.00 16
1994-06-08 Acid Treatment 2168.00 2169.00 0
1996-06-06 Perforation 2164.00 2166.50 17
1996-06-06 Perforation 2160.00 2163.00 17
1996-06-07 Acid Treatment 2160.00 2178.00 0
1990-02-03 Perforation 2205.40 2207.20 13
1990-02-06 Acid Treatment 2205.40 2208.00 0
1991-05-11 Perforation 2209.50 2210.50 18
1991-05-16 Cement Squeeze 2205.40 2210.50 0
1991-05-22 Perforation 2201.50 2202.50 18
1991-05-22 Perforation 2203.50 2207.20 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 542 0.0 0.0 0.0
1995 3253 0.0 0.0 0.0
1996 6671 0.0 0.0 0.0
1997 8601 0.0 0.0 0.0
1998 8627 0.0 0.0 0.0
1999 8305 0.0 0.0 0.0
2000 8213 0.0 0.0 0.0
2001 6998 0.0 0.0 0.0
2002 7338 0.0 0.0 0.0
2003 5691 0.0 0.0 0.0
2004 8646 0.0 0.0 0.0
2005 8692 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8571 0.0 0.0 0.0
2009 8688 0.0 0.0 0.0
2010 8425 0.0 0.0 0.0
2011 8393 0.0 0.0 0.0
2012 8262 0.0 0.0 0.0
2013 8641 0.0 0.0 0.0
2014 8354 0.0 0.0 0.0
2015 8637 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8354 0.0 0.0 0.0
2018 8559 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References