X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033603000

Well Details

Well ID: 0375033603000
Loading map...
Location: 00/03-36-037-03W5/0
Location Alias: 00/03-36-37-03 W5M
Location Alias 2: 00/03-36-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 36
County/Municipality: Red Deer County
Well Name: NAL SYLAKE 3-36-37-3
Operator Name: NAL Resources Limited
License Number: 0009844
License Date: 1955-07-28
License Status: Issued
Spud Date: 1955-08-04
Final Drill Date: 1955-10-15
Well Total Depth: 2844.10 m
Surface Hole Latitude: 52.219016
Surface Hole Longitude: -114.302163

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-07-28 Obtained License
1955-09-04 Drill Stem Test Performed
1955-09-09 Drill Stem Test Performed
1955-09-11 Drill Stem Test Performed
1955-09-15 Drill Stem Test Performed
1955-10-15 Finished Drilling
1955-10-17 Production Casing Operation Performed
1955-10-20 Perforation Treatment Performed - Jet Perforation
1955-10-21 Drill Stem Test Performed
1955-10-22 Drill Stem Test Performed
1955-10-22 Perforation Treatment Performed - Jet Perforation
1955-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-07-29 Perforation Treatment Performed - Bridge Plug No Cement Required
1956-07-29 Perforation Treatment Performed - Jet Perforation
1956-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-21 Well Mode changed to Drilled and Cased
1999-08-03 Well Fluid changed to Gas
1999-08-03 Well Mode changed to Testing
1999-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-04 Plug Back Performed
1999-08-04 Well Fluid changed to Gas
1999-08-04 Well Log Performed
1999-08-04 Well Mode changed to Abandoned Zone
1999-08-05 Perforation Treatment Performed - Jet Perforation
1999-08-05 Well Log Performed
1999-08-06 Perforation Treatment Performed - Remedial Casing
1999-08-08 Perforation Treatment Performed - Remedial Casing
1999-08-10 Well Log Performed
1999-08-11 Perforation Treatment Performed - Jet Perforation
1999-08-11 Well Log Performed
1999-08-13 Well Log Performed
2000-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-13 Perforation Treatment Performed - Jet Perforation
2000-04-13 Well Log Performed
2000-04-15 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-04-15 Perforation Treatment Performed - Jet Perforation
2000-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-17 Perforation Treatment Performed - Jet Perforation
2000-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-10-20 Perforation 2168.30 2171.40 13
1999-08-05 Perforation 1195.00 1196.00 13
1999-08-06 Remedial Casing Cementing 1245.00 1246.00 0
1999-08-08 Remedial Casing Cementing 1195.00 1196.00 0
1999-08-11 Perforation 1208.50 1213.50 17
2000-04-06 Packing Device Capped w/Cement 1208.50 1213.50 0
2000-04-13 Perforation 2201.80 2203.70 18
2000-04-15 Bridge Plug, No Cement 2200.00 2201.00 0
2000-04-15 Perforation 2195.70 2198.20 17
2000-04-16 Acid Treatment 2195.70 2198.20 0
2000-04-17 Packing Device Capped w/Cement 2184.00 2192.00 0
1955-10-22 Perforation 2120.50 2125.10 13
2000-04-17 Perforation 2168.30 2171.40 17
2000-04-17 Perforation 2173.20 2179.00 17
2000-04-19 Acid Treatment 2168.30 2171.40 0
2000-04-19 Acid Treatment 2173.20 2179.00 0
1955-10-23 Acid Treatment 2120.50 2125.10 0
1956-07-29 Bridge Plug, No Cement 2165.90 2165.90 0
1956-07-29 Perforation 2118.40 2121.40 13
1956-07-31 Acid Treatment 2118.40 2121.40 0
1999-08-04 Packing Device Capped w/Cement 2157.90 2165.90 0
1999-08-04 Packing Device Capped w/Cement 2100.00 2108.00 0
1999-08-05 Perforation 1245.00 1246.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0

For data sources see[5]

References