X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041914000

Well Details

Well ID: 0375041914000
Loading map...
Location: 00/14-19-037-04W5/0
Location Alias: 00/14-19-37-04 W5M
Location Alias 2: 00/14-19-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 19
County/Municipality: Clearwater County
Well Name: DEKALB ET AL SYLAKE 14-19-37-4
Operator Name: NAL Resources Limited
License Number: 0102332
License Date: 1983-07-22
License Status: Suspension
Spud Date: 1983-07-26
Final Drill Date: 1983-08-18
Well Total Depth: 2525.00 m
Surface Hole Latitude: 52.199419
Surface Hole Longitude: -114.561899

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-22 Obtained License
1983-08-18 Finished Drilling
1983-08-18 Well Mode changed to Drilled and Cased
1983-08-19 Drill Stem Test Performed
1983-08-21 Production Casing Operation Performed
1983-09-14 Perforation Treatment Performed - Jet Perforation
1983-09-15 Perforation Treatment Performed - Fractured
1983-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-09-24 Plug Back Performed
1983-09-26 Perforation Treatment Performed - Jet Perforation
1983-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-09 Perforation Treatment Performed - Jet Perforation
1983-10-14 Perforation Treatment Performed - Cement Squeeze
1983-10-16 Perforation Treatment Performed - Jet Perforation
1983-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-01 Perforation Treatment Performed - Fractured
1983-12-03 Well Log Performed
1983-12-04 Perforation Treatment Performed - Jet Perforation
1984-01-20 Perforation Treatment Performed - Fractured
1984-01-21 Well Log Performed
1984-02-29 Well Log Performed
1984-03-01 Perforation Treatment Performed - Jet Perforation
1984-03-05 Perforation Treatment Performed - Fractured
1984-06-08 Perforation Treatment Performed - Cement Squeeze
1984-11-22 Well Began Production
1984-11-22 Well Fluid changed to Gas
1984-11-22 Well Mode changed to Flowing
1985-07-07 Perforation Treatment Performed - Jet Perforation
1985-07-07 Well Fluid changed to Gas
1985-07-07 Well Mode changed to Flowing
1985-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-21 Perforation Treatment Performed - Fractured
1985-07-23 Well Log Performed
1986-02-01 Well Fluid changed to Gas
1986-02-01 Well Mode changed to Suspended
1986-08-22 Perforation Treatment Performed - Jet Perforation
1986-08-26 Perforation Treatment Performed - Cement Squeeze
1986-08-26 Plug Back Performed
1986-09-02 Perforation Treatment Performed - Jet Perforation
1986-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-03 Perforation Treatment Performed - Cement Squeeze
1986-10-03 Plug Back Performed
1986-10-08 Perforation Treatment Performed - Jet Perforation
1986-10-08 Well Log Performed
1986-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-30 Well Log Performed
1986-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-14 Perforation 2484.00 2487.00 13
1983-10-18 Acid Treatment 2422.50 2428.00 0
1983-11-01 Fracture 2422.50 2428.00 0
1983-12-04 Perforation 2408.00 2412.50 13
1984-01-20 Fracture 2408.00 2412.50 0
1984-03-01 Perforation 2186.00 2189.00 13
1984-03-05 Fracture 2186.00 2189.00 0
1984-06-08 Cement Squeeze 2186.00 2189.00 0
1985-07-07 Perforation 2374.50 2378.00 13
1985-07-07 Perforation 2380.00 2385.00 13
1985-07-11 Acid Treatment 2374.50 2385.00 0
1983-09-15 Fracture 2484.00 2487.00 0
1985-07-21 Fracture 2374.50 2385.00 0
1986-08-22 Perforation 2467.50 2469.00 13
1986-08-26 Cement Squeeze 2467.50 2469.00 0
1986-09-02 Perforation 2484.00 2487.00 13
1986-09-08 Acid Treatment 2484.00 2487.00 0
1986-10-03 Cement Squeeze 2484.00 2487.00 0
1986-10-08 Perforation 2484.00 2487.00 13
1986-10-09 Acid Treatment 2484.00 2487.00 0
1986-10-31 Packing Device Capped w/Cement 2449.00 2457.00 0
1983-09-24 Packing Device Capped w/Cement 2476.00 2480.00 0
1983-09-26 Perforation 2467.50 2469.00 13
1983-09-27 Acid Treatment 2467.50 2469.00 0
1983-10-07 Packing Device Capped w/Cement 2452.00 2460.00 0
1983-10-09 Perforation 2431.50 2434.50 13
1983-10-14 Cement Squeeze 2431.50 2434.50 0
1983-10-16 Perforation 2422.50 2428.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 289 0.0 0.0 0.0

For data sources see[5]

References