X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043107002

Well Details

Well ID: 0375043107002
Loading map...
Location: 00/07-31-037-04W5/2
Location Alias: 00/07-31-37-04 W5M
Location Alias 2: 00/07-31-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 31
County/Municipality: Clearwater County
Well Name: NAL SYLAKE 7-31-37-4
Operator Name: NAL Resources Limited
License Number: 0069973
License Date: 1978-06-06
License Status: Suspension
Spud Date: 1978-09-03
Final Drill Date: 1978-10-02
Well Total Depth: 2450.00 m
Surface Hole Latitude: 52.221337
Surface Hole Longitude: -114.555765

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-06 Obtained License
1978-09-22 Drill Stem Test Performed
1978-10-02 Finished Drilling
1978-10-02 Well Mode changed to Drilled and Cased
1978-10-04 Drill Stem Test Performed
1978-10-04 Well Log Performed
1978-10-05 Drill Stem Test Performed
1978-10-06 Drill Stem Test Performed
1978-10-07 Production Casing Operation Performed
1978-10-08 Rig Released
1978-11-26 Perforation Treatment Performed - Jet Perforation
1978-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-04 Perforation Treatment Performed - Fractured
1979-01-19 Perforation Treatment Performed - Jet Perforation
1979-01-20 Perforation Treatment Performed - Fractured
1979-01-30 Perforation Treatment Performed - Fractured
1979-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-24 Perforation Treatment Performed - Jet Perforation
1979-03-20 Well Began Production
1979-03-20 Well Fluid changed to Crude Oil
1979-03-20 Well Mode changed to Pumping
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Suspended
1988-11-05 Well Fluid changed to Crude Oil
1988-11-05 Well Mode changed to Pumping
2000-06-01 Well Fluid changed to Crude Oil
2000-06-01 Well Mode changed to Suspended
2003-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-13 Plug Back Performed
2003-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-14 Perforation Treatment Performed - Jet Perforation
2003-03-14 Plug Back Performed
2003-03-14 Well Fluid changed to Crude Oil
2003-03-14 Well Mode changed to Abandoned Zone
2003-03-15 Perforation Treatment Performed - Remedial Casing
2003-06-05 Well Abandoned
2003-06-05 Well Fluid changed to Crude Oil
2003-06-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-26 Perforation 2378.50 2380.00 7
2003-03-13 Packing Device Capped w/Cement 2342.00 2350.00 0
2003-03-14 Perforation 515.00 516.00 14
2003-03-14 Packing Device Capped w/Cement 2152.00 2160.00 0
2003-03-15 Remedial Casing Cementing 515.00 516.00 0
1978-11-27 Acid Treatment 2378.50 2380.00 0
1978-11-29 Acid Treatment 2378.50 2380.00 0
1978-12-04 Fracture 2378.50 2380.00 0
1979-01-19 Perforation 2378.50 2380.00 7
1979-01-20 Fracture 2378.50 2380.00 0
1979-01-30 Fracture 2378.50 2380.00 0
1979-02-24 Perforation 2171.00 2172.50 7
1979-02-24 Acid Treatment 2171.00 2172.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 3485 0.0 0.0 0.0
1980 1454 0.0 0.0 0.0
1981 2093 0.0 0.0 0.0
1982 1896 0.0 0.0 0.0
1983 610 0.0 0.0 0.0
1984 1048 0.0 0.0 0.0
1985 168 0.0 0.0 0.0
1988 1318 0.0 0.0 0.0
1989 6949 0.0 0.0 0.0
1990 7192 0.0 0.0 0.0
1991 6558 0.0 0.0 0.0

For data sources see[5]

References