X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043610000

Well Details

Well ID: 0375043610000
Loading map...
Location: 00/10-36-037-04W5/0
Location Alias: 00/10-36-37-04 W5M
Location Alias 2: 00/10-36-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 36
County/Municipality: Clearwater County
Well Name: NAL SYLVAN LAKE 10-36-37-4
Operator Name: NAL Resources Limited
License Number: 0023419
License Date: 1962-11-29
License Status: Abandoned
Spud Date: 1962-12-10
Final Drill Date: 1962-12-28
Well Total Depth: 2329.30 m
Surface Hole Latitude: 52.226236
Surface Hole Longitude: -114.439079

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-29 Obtained License
1962-12-28 Finished Drilling
1962-12-28 Well Mode changed to Drilled and Cased
1962-12-30 Drill Stem Test Performed
1963-01-01 Drill Stem Test Performed
1963-01-03 Drill Stem Test Performed
1963-01-04 Production Casing Operation Performed
1963-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-05 Perforation Treatment Performed - Jet Perforation
1963-05-06 Perforation Treatment Performed - Cement Squeeze
1963-05-11 Perforation Treatment Performed - Cement Squeeze
1963-05-19 Well Began Production
1963-05-19 Well Fluid changed to Crude Oil
1963-05-19 Well Mode changed to Flowing
1963-05-21 Perforation Treatment Performed - Jet Perforation
1963-12-30 Drill Stem Test Performed
1990-04-17 Perforation Treatment Performed - Jet Perforation
1990-04-17 Well Fluid changed to Crude Oil
1990-04-17 Well Mode changed to Pumping
1990-04-18 Perforation Treatment Performed - Jet Perforation
1990-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-13 Well Log Performed
1995-07-14 Perforation Treatment Performed - Cement Squeeze
1995-07-17 Well Log Performed
1995-07-19 Perforation Treatment Performed - Jet Perforation
1995-07-19 Well Log Performed
1995-07-20 Well Log Performed
1995-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-01 Well Began Injection
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Type changed to Injection
2000-04-25 Well Fluid changed to Crude Oil
2000-04-25 Well Mode changed to Flowing
2000-10-04 Perforation Treatment Performed - Jet Perforation
2000-10-04 Well Log Performed
2000-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-14 Well Fluid changed to Crude Oil
2000-10-14 Well Mode changed to Pumping
2009-02-01 Well Fluid changed to Crude Oil
2009-02-01 Well Mode changed to Suspended
2019-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-08 Plug Back Performed
2019-06-08 Well Fluid changed to Crude Oil
2019-06-08 Well Mode changed to Abandoned Zone
2019-06-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-06-11 Perforation Treatment Performed - Cement Plug
2019-06-11 Perforation Treatment Performed - Jet Perforation
2019-06-11 Plug Back Performed
2019-06-29 Well Abandoned
2019-06-29 Well Fluid changed to Crude Oil
2019-06-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-05 Perforation 2240.90 2242.70 13
1990-04-18 Perforation 2255.20 2260.40 13
1990-04-18 Perforation 2261.90 2264.00 13
1990-04-18 Perforation 2271.40 2272.60 13
1990-04-25 Acid Treatment 2255.20 2279.00 0
1995-07-14 Cement Squeeze 2255.20 2279.00 0
1995-07-19 Perforation 2251.00 2252.50 13
1995-07-19 Perforation 2255.00 2260.00 13
1995-07-21 Acid Treatment 2251.00 2260.00 0
2000-10-04 Perforation 2262.50 2270.00 17
2000-10-04 Perforation 2276.00 2279.00 17
1963-01-05 Acid Treatment 2240.90 2242.70 0
2000-10-06 Acid Treatment 2262.50 2279.00 0
2019-06-08 Packing Device Capped w/Cement 2245.00 2248.00 0
2019-06-08 Packing Device Capped w/Cement 2220.00 2228.00 0
2019-06-10 Hydra Jet Perforation 1735.00 1735.10 0
2019-06-10 Hydra Jet Perforation 1370.00 1370.10 0
2019-06-10 Hydra Jet Perforation 1085.00 1085.10 0
2019-06-10 Hydra Jet Perforation 605.00 605.10 0
2019-06-10 Hydra Jet Perforation 600.00 600.10 0
2019-06-10 Hydra Jet Perforation 510.00 510.10 0
2019-06-11 Perforation 350.00 351.00 13
1963-05-06 Cement Squeeze 2240.90 2242.70 0
2019-06-11 Cement Plug 980.00 1760.00 0
2019-06-11 Cement Plug 232.00 980.00 0
1963-05-11 Cement Squeeze 2240.90 2242.70 0
1963-05-21 Perforation 2267.70 2269.50 7
1963-05-21 Perforation 2276.20 2279.00 7
1990-04-17 Perforation 2265.30 2269.50 13
1990-04-17 Perforation 2271.90 2272.60 13
1990-04-17 Perforation 2276.20 2279.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6050 0.0 0.0 0.0
1968 5542 0.0 0.0 0.0
1969 6783 0.0 0.0 0.0
1970 5310 0.0 0.0 0.0
1971 5545 0.0 0.0 0.0
1972 7492 0.0 0.0 0.0
1973 7827 0.0 0.0 0.0
1974 5242 0.0 0.0 0.0
1975 4487 0.0 0.0 0.0
1976 4247 0.0 0.0 0.0
1977 5145 0.0 0.0 0.0
1978 4986 0.0 0.0 0.0
1979 7436 0.0 0.0 0.0
1980 7585 0.0 0.0 0.0
1981 7844 0.0 0.0 0.0
1982 7366 0.0 0.0 0.0
1983 8040 0.0 0.0 0.0
1984 8603 0.0 0.0 0.0
1985 8408 0.0 0.0 0.0
1986 7951 0.0 0.0 0.0
1987 8550 0.0 0.0 0.0
1988 8314 0.0 0.0 0.0
1989 8339 0.0 0.0 0.0
1990 7645 0.0 0.0 0.0
1991 8605 0.0 0.0 0.0
1992 8499 0.0 0.0 0.0
1993 8304 0.0 0.0 0.0
1994 8441 0.0 0.0 0.0
1995 3341 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 5304 0.0 0.0 0.0
2001 8578 0.0 0.0 0.0
2002 8450 0.0 0.0 0.0
2003 8633 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8719 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 4232 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References