X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375050306002

Well Details

Well ID: 0375050306002
Loading map...
Location: 00/06-03-037-05W5/2
Location Alias: 00/06-03-37-05 W5M
Location Alias 2: 00/06-03-037-05 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 05
Section: 03
County/Municipality: Clearwater County
Well Name: SOGAR ET AL GARRINGTON 6-3-37-5
Operator Name: Sogar Resources Ltd.
License Number: 0075951
License Date: 1979-05-29
License Status: Suspension
Spud Date: 1979-06-03
Final Drill Date: 1979-07-02
Well Total Depth: 2593.00 m
Surface Hole Latitude: 52.149102
Surface Hole Longitude: -114.636725

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-29 Obtained License
1979-06-20 Drill Stem Test Performed
1979-06-27 Drill Stem Test Performed
1979-07-02 Finished Drilling
1979-07-02 Well Mode changed to Drilled and Cased
1979-07-04 Drill Stem Test Performed
1979-07-05 Drill Stem Test Performed
1979-07-07 Production Casing Operation Performed
1979-07-16 Perforation Treatment Performed - Jet Perforation
1983-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-09 Well Log Performed
1983-08-11 Perforation Treatment Performed - Jet Perforation
1983-08-11 Well Log Performed
1983-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-13 Perforation Treatment Performed - Fractured
1984-08-14 Well Log Performed
1984-09-01 Well Began Production
1984-09-01 Well Fluid changed to Crude Oil
1984-09-01 Well Mode changed to Pumping
2009-06-30 Well Fluid changed to Crude Oil
2009-06-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-16 Perforation 2486.50 2490.50 7
1979-07-16 Perforation 2492.50 2495.50 7
1983-08-09 Packing Device Capped w/Cement 2470.00 2478.00 0
1983-08-11 Perforation 2282.50 2285.50 13
1983-08-21 Acid Treatment 2282.50 2285.50 0
1984-08-13 Fracture 2282.50 2285.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2376 0.0 0.0 0.0
1985 6218 0.0 0.0 0.0
1986 7464 0.0 0.0 0.0
1987 7825 0.0 0.0 0.0
1988 7994 0.0 0.0 0.0
1989 8540 0.0 0.0 0.0
1990 8628 0.0 0.0 0.0
1991 8542 0.0 0.0 0.0
1992 8531 0.0 0.0 0.0
1993 8660 0.0 0.0 0.0
1994 8449 0.0 0.0 0.0
1995 7104 0.0 0.0 0.0
1996 8685 0.0 0.0 0.0
1997 7023 0.0 0.0 0.0
1998 5210 0.0 0.0 0.0
1999 8429 0.0 0.0 0.0
2000 8064 0.0 0.0 0.0
2001 7572 0.0 0.0 0.0
2002 7952 0.0 0.0 0.0
2003 7349 0.0 0.0 0.0
2004 8277 0.0 0.0 0.0
2005 7801 0.0 0.0 0.0
2006 7352 0.0 0.0 0.0
2007 692 0.0 0.0 0.0

For data sources see[5]

References