If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375071703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.198304,"lon":-114.972251,"icon":""}]} |
Location: 00/03-17-037-07W5/0 | |
Location Alias: 00/03-17-37-07 W5M | |
Location Alias 2: 00/03-17-037-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 07 | |
Section: 17 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ FERRIER 3-17-37-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0496891 | |
License Date: 2019-12-11 | |
License Status: Issued | |
Spud Date: 2019-12-28 | |
Final Drill Date: 2020-01-07 | |
Well Total Depth: 4799.00 m | |
Surface Hole Latitude: 52.198304 | |
Surface Hole Longitude: -114.972251 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-12-28 | Stampede Drilling A Division Of Matrix Energy Technologi | 5 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-12-30 | 693.50 | Deviate (5 - 79 degrees) |
2020-01-04 | 2503.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-01-29 | Multi-Stage Fracture | 4753.20 | 4753.30 | 0 |
2020-01-30 | Multi-Stage Fracture | 4560.70 | 4560.80 | 0 |
2020-02-02 | Multi-Stage Fracture | 2988.30 | 2988.40 | 0 |
2020-02-02 | Multi-Stage Fracture | 2970.80 | 2970.90 | 0 |
2020-02-02 | Multi-Stage Fracture | 2953.80 | 2953.90 | 0 |
2020-02-02 | Multi-Stage Fracture | 2936.40 | 2936.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 2918.90 | 2919.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 2901.50 | 2901.60 | 0 |
2020-02-02 | Multi-Stage Fracture | 2884.20 | 2884.30 | 0 |
2020-02-02 | Multi-Stage Fracture | 2866.90 | 2867.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 2849.40 | 2849.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 2831.70 | 2831.80 | 0 |
2020-01-30 | Multi-Stage Fracture | 4543.20 | 4543.30 | 0 |
2020-02-02 | Multi-Stage Fracture | 2813.90 | 2814.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 2796.50 | 2796.60 | 0 |
2020-02-02 | Multi-Stage Fracture | 2779.20 | 2779.30 | 0 |
2020-02-02 | Multi-Stage Fracture | 2761.90 | 2762.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 2744.40 | 2744.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 2727.30 | 2727.40 | 0 |
2020-02-02 | Multi-Stage Fracture | 2709.90 | 2710.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 2692.60 | 2692.70 | 0 |
2020-02-02 | Multi-Stage Fracture | 2675.20 | 2675.30 | 0 |
2020-02-02 | Multi-Stage Fracture | 2657.70 | 2657.80 | 0 |
2020-01-30 | Multi-Stage Fracture | 4525.60 | 4525.70 | 0 |
2020-02-02 | Multi-Stage Fracture | 2640.50 | 2640.60 | 0 |
2020-02-02 | Multi-Stage Fracture | 2623.00 | 2623.10 | 0 |
2020-02-02 | Multi-Stage Fracture | 2605.50 | 2605.60 | 0 |
2020-02-02 | Multi-Stage Fracture | 2588.00 | 2588.10 | 0 |
2020-02-02 | Multi-Stage Fracture | 2570.40 | 2570.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 2552.70 | 2552.80 | 0 |
2020-01-30 | Multi-Stage Fracture | 4508.30 | 4508.40 | 0 |
2020-01-30 | Multi-Stage Fracture | 4490.60 | 4490.70 | 0 |
2020-01-30 | Multi-Stage Fracture | 4473.10 | 4473.20 | 0 |
2020-01-30 | Multi-Stage Fracture | 4455.40 | 4455.50 | 0 |
2020-01-30 | Multi-Stage Fracture | 4438.00 | 4438.10 | 0 |
2020-01-30 | Multi-Stage Fracture | 4420.50 | 4420.60 | 0 |
2020-01-30 | Multi-Stage Fracture | 4403.20 | 4403.30 | 0 |
2020-01-29 | Multi-Stage Fracture | 4718.20 | 4718.30 | 0 |
2020-01-30 | Multi-Stage Fracture | 4385.60 | 4385.70 | 0 |
2020-01-31 | Multi-Stage Fracture | 4368.20 | 4368.30 | 0 |
2020-01-31 | Multi-Stage Fracture | 4350.70 | 4350.80 | 0 |
2020-01-31 | Multi-Stage Fracture | 4332.90 | 4333.00 | 0 |
2020-01-31 | Multi-Stage Fracture | 4315.60 | 4315.70 | 0 |
2020-01-31 | Multi-Stage Fracture | 4298.10 | 4298.20 | 0 |
2020-01-31 | Multi-Stage Fracture | 4280.90 | 4281.00 | 0 |
2020-01-31 | Multi-Stage Fracture | 4263.60 | 4263.70 | 0 |
2020-01-31 | Multi-Stage Fracture | 4246.30 | 4246.40 | 0 |
2020-01-31 | Multi-Stage Fracture | 4228.80 | 4228.90 | 0 |
2020-01-29 | Multi-Stage Fracture | 4700.50 | 4700.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 4211.50 | 4211.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 4193.80 | 4193.90 | 0 |
2020-01-31 | Multi-Stage Fracture | 4176.20 | 4176.30 | 0 |
2020-01-31 | Multi-Stage Fracture | 4158.90 | 4159.00 | 0 |
2020-01-31 | Multi-Stage Fracture | 4141.50 | 4141.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 4124.20 | 4124.30 | 0 |
2020-01-31 | Multi-Stage Fracture | 4106.50 | 4106.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 4089.10 | 4089.20 | 0 |
2020-01-31 | Multi-Stage Fracture | 4071.50 | 4071.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 4054.10 | 4054.20 | 0 |
2020-01-29 | Multi-Stage Fracture | 4682.90 | 4683.00 | 0 |
2020-01-31 | Multi-Stage Fracture | 4036.70 | 4036.80 | 0 |
2020-01-31 | Multi-Stage Fracture | 4019.20 | 4019.30 | 0 |
2020-01-31 | Multi-Stage Fracture | 4001.50 | 4001.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 3984.10 | 3984.20 | 0 |
2020-01-31 | Multi-Stage Fracture | 3966.50 | 3966.60 | 0 |
2020-01-31 | Multi-Stage Fracture | 3949.30 | 3949.40 | 0 |
2020-01-31 | Multi-Stage Fracture | 3931.70 | 3931.80 | 0 |
2020-01-31 | Multi-Stage Fracture | 3914.10 | 3914.20 | 0 |
2020-01-31 | Multi-Stage Fracture | 3896.80 | 3896.90 | 0 |
2020-02-01 | Multi-Stage Fracture | 3879.50 | 3879.60 | 0 |
2020-01-30 | Multi-Stage Fracture | 4665.40 | 4665.50 | 0 |
2020-02-01 | Multi-Stage Fracture | 3861.80 | 3861.90 | 0 |
2020-02-01 | Multi-Stage Fracture | 3844.30 | 3844.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3826.90 | 3827.00 | 0 |
2020-02-01 | Multi-Stage Fracture | 3809.50 | 3809.60 | 0 |
2020-02-01 | Multi-Stage Fracture | 3791.70 | 3791.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3774.50 | 3774.60 | 0 |
2020-02-01 | Multi-Stage Fracture | 3757.00 | 3757.10 | 0 |
2020-02-01 | Multi-Stage Fracture | 3739.30 | 3739.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3722.20 | 3722.30 | 0 |
2020-02-01 | Multi-Stage Fracture | 3704.70 | 3704.80 | 0 |
2020-01-30 | Multi-Stage Fracture | 4630.70 | 4630.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3687.30 | 3687.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3669.70 | 3669.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3652.50 | 3652.60 | 0 |
2020-02-01 | Multi-Stage Fracture | 3635.00 | 3635.10 | 0 |
2020-02-01 | Multi-Stage Fracture | 3617.90 | 3618.00 | 0 |
2020-02-01 | Multi-Stage Fracture | 3600.30 | 3600.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3583.00 | 3583.10 | 0 |
2020-02-01 | Multi-Stage Fracture | 3565.70 | 3565.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3548.10 | 3548.20 | 0 |
2020-02-01 | Multi-Stage Fracture | 3530.60 | 3530.70 | 0 |
2020-01-30 | Multi-Stage Fracture | 4613.00 | 4613.10 | 0 |
2020-02-01 | Multi-Stage Fracture | 3513.30 | 3513.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3495.90 | 3496.00 | 0 |
2020-02-01 | Multi-Stage Fracture | 3478.20 | 3478.30 | 0 |
2020-02-01 | Multi-Stage Fracture | 3460.70 | 3460.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3443.20 | 3443.30 | 0 |
2020-02-01 | Multi-Stage Fracture | 3425.70 | 3425.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3408.30 | 3408.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3390.70 | 3390.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3373.30 | 3373.40 | 0 |
2020-02-01 | Multi-Stage Fracture | 3355.80 | 3355.90 | 0 |
2020-01-30 | Multi-Stage Fracture | 4595.50 | 4595.60 | 0 |
2020-02-01 | Multi-Stage Fracture | 3338.40 | 3338.50 | 0 |
2020-02-01 | Multi-Stage Fracture | 3320.70 | 3320.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3303.10 | 3303.20 | 0 |
2020-02-01 | Multi-Stage Fracture | 3285.60 | 3285.70 | 0 |
2020-02-01 | Multi-Stage Fracture | 3268.00 | 3268.10 | 0 |
2020-02-01 | Multi-Stage Fracture | 3250.50 | 3250.60 | 0 |
2020-02-01 | Multi-Stage Fracture | 3233.10 | 3233.20 | 0 |
2020-02-01 | Multi-Stage Fracture | 3215.40 | 3215.50 | 0 |
2020-02-01 | Multi-Stage Fracture | 3197.70 | 3197.80 | 0 |
2020-02-01 | Multi-Stage Fracture | 3180.30 | 3180.40 | 0 |
2020-01-30 | Multi-Stage Fracture | 4578.00 | 4578.10 | 0 |
2020-02-02 | Multi-Stage Fracture | 3162.80 | 3162.90 | 0 |
2020-02-02 | Multi-Stage Fracture | 3145.60 | 3145.70 | 0 |
2020-02-02 | Multi-Stage Fracture | 3128.40 | 3128.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 3110.80 | 3110.90 | 0 |
2020-02-02 | Multi-Stage Fracture | 3093.40 | 3093.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 3075.90 | 3076.00 | 0 |
2020-02-02 | Multi-Stage Fracture | 3058.40 | 3058.50 | 0 |
2020-02-02 | Multi-Stage Fracture | 3041.00 | 3041.10 | 0 |
2020-02-02 | Multi-Stage Fracture | 3023.50 | 3023.60 | 0 |
2020-02-02 | Multi-Stage Fracture | 3005.90 | 3006.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 1191 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-01-09 | No Incident Encountered | 0.00 | 0.00 |
2020-02-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]