If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375071704020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.198499,"lon":-114.972257,"icon":""}]} |
Location: 02/04-17-037-07W5/0 | |
Location Alias: 02/04-17-37-07 W5M | |
Location Alias 2: 02/04-17-037-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 07 | |
Section: 17 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 102 CHEDDER 4-17-37-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0493907 | |
License Date: 2019-03-04 | |
License Status: Issued | |
Spud Date: 2019-06-03 | |
Final Drill Date: 2019-06-13 | |
Well Total Depth: 4814.00 m | |
Surface Hole Latitude: 52.198499 | |
Surface Hole Longitude: -114.972257 |
Date | Event |
---|---|
2019-03-04 | Obtained License |
2019-06-03 | Drill To LD |
2019-06-04 | Surface Casing Operation Performed |
2019-06-08 | Direction Drilling Operation Performed - Deviate |
2019-06-09 | Direction Drilling Operation Performed - Horizontal |
2019-06-13 | Finished Drilling |
2019-06-13 | Well Log Performed |
2019-06-13 | Well Mode changed to Drilled and Cased |
2019-06-15 | Production Casing Operation Performed |
2019-06-15 | Rig Released |
2019-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-08-01 | Well Began Production |
2019-08-01 | Well Fluid changed to Crude Oil |
2019-08-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-06-03 | Stampede Drilling A Division Of Matrix Energy Technologi | 5 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-06-08 | 1924.50 | Deviate (5 - 79 degrees) |
2019-06-09 | 2521.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-07-28 | Multi-Stage Fracture | 4774.00 | 4774.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4604.80 | 4604.90 | 0 |
2019-07-31 | Multi-Stage Fracture | 3029.40 | 3029.50 | 0 |
2019-07-31 | Multi-Stage Fracture | 3012.00 | 3012.10 | 0 |
2019-07-31 | Multi-Stage Fracture | 2994.50 | 2994.60 | 0 |
2019-07-31 | Multi-Stage Fracture | 2976.90 | 2977.00 | 0 |
2019-07-31 | Multi-Stage Fracture | 2959.30 | 2959.40 | 0 |
2019-07-31 | Multi-Stage Fracture | 2941.90 | 2942.00 | 0 |
2019-07-31 | Multi-Stage Fracture | 2924.50 | 2924.60 | 0 |
2019-07-31 | Multi-Stage Fracture | 2907.10 | 2907.20 | 0 |
2019-07-31 | Multi-Stage Fracture | 2889.80 | 2889.90 | 0 |
2019-07-31 | Multi-Stage Fracture | 2872.40 | 2872.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 4587.10 | 4587.20 | 0 |
2019-07-31 | Multi-Stage Fracture | 2855.00 | 2855.10 | 0 |
2019-07-31 | Multi-Stage Fracture | 2837.30 | 2837.40 | 0 |
2019-07-31 | Multi-Stage Fracture | 2819.70 | 2819.80 | 0 |
2019-07-31 | Multi-Stage Fracture | 2802.20 | 2802.30 | 0 |
2019-07-31 | Multi-Stage Fracture | 2784.60 | 2784.70 | 0 |
2019-07-31 | Multi-Stage Fracture | 2767.30 | 2767.40 | 0 |
2019-07-31 | Multi-Stage Fracture | 2750.10 | 2750.20 | 0 |
2019-07-31 | Multi-Stage Fracture | 2732.60 | 2732.70 | 0 |
2019-07-31 | Multi-Stage Fracture | 2715.20 | 2715.30 | 0 |
2019-07-31 | Multi-Stage Fracture | 2697.90 | 2698.00 | 0 |
2019-07-29 | Multi-Stage Fracture | 4569.80 | 4569.90 | 0 |
2019-07-31 | Multi-Stage Fracture | 2680.50 | 2680.60 | 0 |
2019-07-31 | Multi-Stage Fracture | 2663.20 | 2663.30 | 0 |
2019-07-31 | Multi-Stage Fracture | 2645.80 | 2645.90 | 0 |
2019-07-31 | Multi-Stage Fracture | 2628.20 | 2628.30 | 0 |
2019-07-31 | Multi-Stage Fracture | 2610.50 | 2610.60 | 0 |
2019-07-31 | Multi-Stage Fracture | 2593.10 | 2593.20 | 0 |
2019-07-31 | Multi-Stage Fracture | 2575.80 | 2575.90 | 0 |
2019-07-29 | Multi-Stage Fracture | 4552.70 | 4552.80 | 0 |
2019-07-29 | Multi-Stage Fracture | 4535.10 | 4535.20 | 0 |
2019-07-29 | Multi-Stage Fracture | 4517.60 | 4517.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 4500.30 | 4500.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 4483.30 | 4483.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 4465.80 | 4465.90 | 0 |
2019-07-29 | Multi-Stage Fracture | 4448.20 | 4448.30 | 0 |
2019-07-29 | Multi-Stage Fracture | 4745.00 | 4745.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4430.50 | 4430.60 | 0 |
2019-07-29 | Multi-Stage Fracture | 4412.90 | 4413.00 | 0 |
2019-07-29 | Multi-Stage Fracture | 4395.30 | 4395.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 4377.50 | 4377.60 | 0 |
2019-07-29 | Multi-Stage Fracture | 4360.10 | 4360.20 | 0 |
2019-07-29 | Multi-Stage Fracture | 4342.40 | 4342.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 4325.00 | 4325.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4307.60 | 4307.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 4290.00 | 4290.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4272.60 | 4272.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 4727.40 | 4727.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 4255.00 | 4255.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4237.30 | 4237.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 4220.00 | 4220.10 | 0 |
2019-07-29 | Multi-Stage Fracture | 4202.40 | 4202.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 4184.80 | 4184.90 | 0 |
2019-07-29 | Multi-Stage Fracture | 4167.30 | 4167.40 | 0 |
2019-07-29 | Multi-Stage Fracture | 4149.40 | 4149.60 | 0 |
2019-07-30 | Multi-Stage Fracture | 4131.80 | 4131.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 4114.30 | 4114.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 4096.60 | 4096.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 4709.80 | 4709.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 4079.10 | 4079.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 4061.70 | 4061.80 | 0 |
2019-07-30 | Multi-Stage Fracture | 4044.30 | 4044.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 4026.90 | 4027.00 | 0 |
2019-07-30 | Multi-Stage Fracture | 4009.40 | 4009.50 | 0 |
2019-07-30 | Multi-Stage Fracture | 3992.30 | 3992.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3974.90 | 3975.00 | 0 |
2019-07-30 | Multi-Stage Fracture | 3957.60 | 3957.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3940.20 | 3940.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3922.60 | 3922.70 | 0 |
2019-07-29 | Multi-Stage Fracture | 4692.30 | 4692.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3905.20 | 3905.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3887.90 | 3888.00 | 0 |
2019-07-30 | Multi-Stage Fracture | 3870.40 | 3870.50 | 0 |
2019-07-30 | Multi-Stage Fracture | 3852.70 | 3852.80 | 0 |
2019-07-30 | Multi-Stage Fracture | 3834.60 | 3834.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3817.20 | 3817.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3799.70 | 3799.80 | 0 |
2019-07-30 | Multi-Stage Fracture | 3782.10 | 3782.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 3764.20 | 3764.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3746.40 | 3746.50 | 0 |
2019-07-29 | Multi-Stage Fracture | 4675.00 | 4675.10 | 0 |
2019-07-30 | Multi-Stage Fracture | 3728.60 | 3728.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3711.20 | 3711.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3693.60 | 3693.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3676.20 | 3676.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3658.90 | 3659.00 | 0 |
2019-07-30 | Multi-Stage Fracture | 3641.10 | 3641.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 3623.30 | 3623.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3605.50 | 3605.60 | 0 |
2019-07-30 | Multi-Stage Fracture | 3587.80 | 3587.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3569.90 | 3570.00 | 0 |
2019-07-29 | Multi-Stage Fracture | 4657.50 | 4657.60 | 0 |
2019-07-30 | Multi-Stage Fracture | 3552.30 | 3552.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3534.60 | 3534.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3517.10 | 3517.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 3499.50 | 3499.60 | 0 |
2019-07-30 | Multi-Stage Fracture | 3481.80 | 3481.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3464.30 | 3464.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3446.60 | 3446.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3429.00 | 3429.10 | 0 |
2019-07-30 | Multi-Stage Fracture | 3411.70 | 3411.80 | 0 |
2019-07-30 | Multi-Stage Fracture | 3393.90 | 3394.00 | 0 |
2019-07-29 | Multi-Stage Fracture | 4640.00 | 4640.10 | 0 |
2019-07-30 | Multi-Stage Fracture | 3376.40 | 3376.50 | 0 |
2019-07-30 | Multi-Stage Fracture | 3359.10 | 3359.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 3341.70 | 3341.80 | 0 |
2019-07-30 | Multi-Stage Fracture | 3324.10 | 3324.20 | 0 |
2019-07-30 | Multi-Stage Fracture | 3306.80 | 3306.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3289.20 | 3289.30 | 0 |
2019-07-30 | Multi-Stage Fracture | 3271.80 | 3271.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3254.40 | 3254.50 | 0 |
2019-07-30 | Multi-Stage Fracture | 3236.80 | 3236.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3219.20 | 3219.30 | 0 |
2019-07-29 | Multi-Stage Fracture | 4622.40 | 4622.50 | 0 |
2019-07-30 | Multi-Stage Fracture | 3201.60 | 3201.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3183.80 | 3183.90 | 0 |
2019-07-30 | Multi-Stage Fracture | 3166.60 | 3166.70 | 0 |
2019-07-30 | Multi-Stage Fracture | 3151.30 | 3151.40 | 0 |
2019-07-30 | Multi-Stage Fracture | 3133.90 | 3134.00 | 0 |
2019-07-30 | Multi-Stage Fracture | 3116.50 | 3116.60 | 0 |
2019-07-31 | Multi-Stage Fracture | 3099.20 | 3099.30 | 0 |
2019-07-31 | Multi-Stage Fracture | 3081.70 | 3081.80 | 0 |
2019-07-31 | Multi-Stage Fracture | 3063.90 | 3064.00 | 0 |
2019-07-31 | Multi-Stage Fracture | 3046.60 | 3046.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-28 | 2019-07-31 | 2,325 | 12,367 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.3864 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.2735 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3819 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0076 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0076 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0782 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0782 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0587 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0587 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.061 | N/A | |
Methanol | 67-56-1 | 100 | 0.061 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.061 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-28 | 2019-07-31 | Surface Water - River | 11340 |
2019-07-28 | 2019-07-28 | Recycled Fracturing Water (treated at well site) | 1229 |
2019-07-29 | 2019-07-31 | Oilfield Produced Water | 202 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 3515 | 0.0 | 0.0 | 0.0 |
2020 | 2003 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-15 | No Incident Encountered | 0.00 | 0.00 |
2019-08-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]