If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375081305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.156549,"lon":-115.022133,"icon":""}]} |
Location: 00/05-13-037-08W5/0 | |
Location Alias: 00/05-13-37-08 W5M | |
Location Alias 2: 00/05-13-037-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 08 | |
Section: 13 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ CHEDDER 5-13-37-8 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0493880 | |
License Date: 2019-02-26 | |
License Status: Issued | |
Spud Date: 2019-03-15 | |
Final Drill Date: 2019-06-06 | |
Well Total Depth: 4923.00 m | |
Surface Hole Latitude: 52.156549 | |
Surface Hole Longitude: -115.022133 |
Date | Event |
---|---|
2019-02-26 | Obtained License |
2019-03-16 | Surface Casing Operation Performed |
2019-05-31 | Direction Drilling Operation Performed - Deviate |
2019-06-01 | Direction Drilling Operation Performed - Horizontal |
2019-06-06 | Finished Drilling |
2019-06-06 | Well Log Performed |
2019-06-06 | Well Mode changed to Drilled and Cased |
2019-06-08 | Production Casing Operation Performed |
2019-06-08 | Rig Released |
2019-08-01 | Well Began Production |
2019-08-01 | Well Fluid changed to Crude Oil |
2019-08-01 | Well Mode changed to Flowing |
2019-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-08-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-08-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-08-09 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-03-15 | Stampede Drilling A Division Of Matrix Energy Technologi | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-05-31 | 2087.60 | Deviate (5 - 79 degrees) |
2019-06-01 | 2606.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-08-06 | Multi-Stage Fracture | 4881.90 | 4882.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4714.70 | 4714.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 3102.30 | 3102.40 | 0 |
2019-08-09 | Multi-Stage Fracture | 3084.50 | 3084.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 3066.50 | 3066.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 3048.60 | 3048.70 | 0 |
2019-08-09 | Multi-Stage Fracture | 3030.70 | 3030.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 3012.80 | 3012.90 | 0 |
2019-08-09 | Multi-Stage Fracture | 2994.80 | 2994.90 | 0 |
2019-08-09 | Multi-Stage Fracture | 2976.90 | 2977.00 | 0 |
2019-08-09 | Multi-Stage Fracture | 2958.90 | 2959.00 | 0 |
2019-08-09 | Multi-Stage Fracture | 2941.10 | 2941.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4696.60 | 4696.70 | 0 |
2019-08-09 | Multi-Stage Fracture | 2923.20 | 2923.30 | 0 |
2019-08-09 | Multi-Stage Fracture | 2905.30 | 2905.40 | 0 |
2019-08-09 | Multi-Stage Fracture | 2887.30 | 2887.40 | 0 |
2019-08-09 | Multi-Stage Fracture | 2869.30 | 2869.40 | 0 |
2019-08-09 | Multi-Stage Fracture | 2851.40 | 2851.50 | 0 |
2019-08-09 | Multi-Stage Fracture | 2833.50 | 2833.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 2815.60 | 2815.70 | 0 |
2019-08-09 | Multi-Stage Fracture | 2797.60 | 2797.70 | 0 |
2019-08-09 | Multi-Stage Fracture | 2779.70 | 2779.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 2761.90 | 2762.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4678.70 | 4678.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 2744.00 | 2744.10 | 0 |
2019-08-09 | Multi-Stage Fracture | 2726.10 | 2726.20 | 0 |
2019-08-09 | Multi-Stage Fracture | 2708.10 | 2708.20 | 0 |
2019-08-09 | Multi-Stage Fracture | 2690.20 | 2690.30 | 0 |
2019-08-09 | Multi-Stage Fracture | 2672.30 | 2672.40 | 0 |
2019-08-09 | Multi-Stage Fracture | 2654.40 | 2654.50 | 0 |
2019-08-07 | Multi-Stage Fracture | 4660.80 | 4660.90 | 0 |
2019-08-07 | Multi-Stage Fracture | 4642.90 | 4643.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4624.90 | 4625.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4606.90 | 4607.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4588.90 | 4589.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4570.90 | 4571.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4553.00 | 4553.10 | 0 |
2019-08-07 | Multi-Stage Fracture | 4858.10 | 4858.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4535.10 | 4535.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4517.20 | 4517.30 | 0 |
2019-08-07 | Multi-Stage Fracture | 4499.20 | 4499.30 | 0 |
2019-08-07 | Multi-Stage Fracture | 4481.30 | 4481.40 | 0 |
2019-08-07 | Multi-Stage Fracture | 4463.40 | 4463.50 | 0 |
2019-08-07 | Multi-Stage Fracture | 4445.40 | 4445.50 | 0 |
2019-08-07 | Multi-Stage Fracture | 4427.50 | 4427.60 | 0 |
2019-08-07 | Multi-Stage Fracture | 4409.50 | 4409.60 | 0 |
2019-08-07 | Multi-Stage Fracture | 4391.60 | 4391.70 | 0 |
2019-08-07 | Multi-Stage Fracture | 4373.70 | 4373.80 | 0 |
2019-08-07 | Multi-Stage Fracture | 4840.10 | 4840.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4355.80 | 4355.90 | 0 |
2019-08-07 | Multi-Stage Fracture | 4337.90 | 4338.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4319.90 | 4320.00 | 0 |
2019-08-07 | Multi-Stage Fracture | 4301.80 | 4301.90 | 0 |
2019-08-07 | Multi-Stage Fracture | 4283.80 | 4283.90 | 0 |
2019-08-07 | Multi-Stage Fracture | 4266.00 | 4266.10 | 0 |
2019-08-07 | Multi-Stage Fracture | 4248.10 | 4248.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4230.20 | 4230.30 | 0 |
2019-08-07 | Multi-Stage Fracture | 4212.40 | 4212.50 | 0 |
2019-08-07 | Multi-Stage Fracture | 4194.50 | 4194.60 | 0 |
2019-08-07 | Multi-Stage Fracture | 4822.20 | 4822.30 | 0 |
2019-08-07 | Multi-Stage Fracture | 4176.70 | 4176.80 | 0 |
2019-08-07 | Multi-Stage Fracture | 4158.70 | 4158.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 4140.70 | 4140.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 4122.90 | 4123.00 | 0 |
2019-08-08 | Multi-Stage Fracture | 4104.90 | 4105.00 | 0 |
2019-08-08 | Multi-Stage Fracture | 4087.00 | 4087.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 4069.00 | 4069.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 4051.20 | 4051.30 | 0 |
2019-08-08 | Multi-Stage Fracture | 4033.30 | 4033.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 4015.40 | 4015.50 | 0 |
2019-08-07 | Multi-Stage Fracture | 4804.30 | 4804.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 3997.50 | 3997.60 | 0 |
2019-08-08 | Multi-Stage Fracture | 3979.60 | 3979.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3961.70 | 3961.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 3943.80 | 3943.90 | 0 |
2019-08-08 | Multi-Stage Fracture | 3925.90 | 3926.00 | 0 |
2019-08-08 | Multi-Stage Fracture | 3908.00 | 3908.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 3890.10 | 3890.20 | 0 |
2019-08-08 | Multi-Stage Fracture | 3872.20 | 3872.30 | 0 |
2019-08-08 | Multi-Stage Fracture | 3854.30 | 3854.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 3836.50 | 3836.60 | 0 |
2019-08-07 | Multi-Stage Fracture | 4786.50 | 4786.60 | 0 |
2019-08-08 | Multi-Stage Fracture | 3818.50 | 3818.60 | 0 |
2019-08-08 | Multi-Stage Fracture | 3800.60 | 3800.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3782.70 | 3782.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 3764.80 | 3764.90 | 0 |
2019-08-08 | Multi-Stage Fracture | 3746.90 | 3747.00 | 0 |
2019-08-08 | Multi-Stage Fracture | 3729.00 | 3729.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 3711.00 | 3711.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 3693.00 | 3693.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 3675.10 | 3675.20 | 0 |
2019-08-08 | Multi-Stage Fracture | 3657.20 | 3657.30 | 0 |
2019-08-07 | Multi-Stage Fracture | 4768.60 | 4768.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3639.30 | 3639.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 3621.30 | 3621.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 3603.40 | 3603.50 | 0 |
2019-08-08 | Multi-Stage Fracture | 3585.50 | 3585.60 | 0 |
2019-08-08 | Multi-Stage Fracture | 3567.60 | 3567.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3549.70 | 3549.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 3531.80 | 3531.90 | 0 |
2019-08-08 | Multi-Stage Fracture | 3513.90 | 3514.00 | 0 |
2019-08-08 | Multi-Stage Fracture | 3496.00 | 3496.10 | 0 |
2019-08-08 | Multi-Stage Fracture | 3478.10 | 3478.20 | 0 |
2019-08-07 | Multi-Stage Fracture | 4750.60 | 4750.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3460.20 | 3460.30 | 0 |
2019-08-08 | Multi-Stage Fracture | 3442.30 | 3442.40 | 0 |
2019-08-08 | Multi-Stage Fracture | 3424.50 | 3424.60 | 0 |
2019-08-08 | Multi-Stage Fracture | 3406.60 | 3406.70 | 0 |
2019-08-08 | Multi-Stage Fracture | 3388.70 | 3388.80 | 0 |
2019-08-08 | Multi-Stage Fracture | 3370.80 | 3370.90 | 0 |
2019-08-08 | Multi-Stage Fracture | 3352.90 | 3353.00 | 0 |
2019-08-09 | Multi-Stage Fracture | 3335.00 | 3335.10 | 0 |
2019-08-09 | Multi-Stage Fracture | 3317.10 | 3317.20 | 0 |
2019-08-09 | Multi-Stage Fracture | 3299.30 | 3299.40 | 0 |
2019-08-07 | Multi-Stage Fracture | 4732.70 | 4732.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 3281.40 | 3281.50 | 0 |
2019-08-09 | Multi-Stage Fracture | 3263.50 | 3263.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 3245.50 | 3245.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 3227.50 | 3227.60 | 0 |
2019-08-09 | Multi-Stage Fracture | 3209.60 | 3209.70 | 0 |
2019-08-09 | Multi-Stage Fracture | 3191.70 | 3191.80 | 0 |
2019-08-09 | Multi-Stage Fracture | 3173.90 | 3174.00 | 0 |
2019-08-09 | Multi-Stage Fracture | 3156.00 | 3156.10 | 0 |
2019-08-09 | Multi-Stage Fracture | 3138.10 | 3138.20 | 0 |
2019-08-09 | Multi-Stage Fracture | 3120.20 | 3120.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-08-06 | 2019-08-09 | 2,434 | 12,284 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.4538 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.2306 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3573 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0092 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0092 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0768 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0768 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0561 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0561 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0615 | N/A | |
Methanol | 67-56-1 | 100 | 0.0615 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0615 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-08-06 | 2019-08-09 | Surface Water - River | 9724 |
2019-08-06 | 2019-08-09 | Oilfield Produced Water | 745 |
2019-08-06 | 2019-08-09 | Oilfield Produced Water | 413 |
2019-08-06 | 2019-08-09 | Oilfield Produced Water | 1647 |
2019-08-07 | 2019-08-27 | Oilfield Produced Water | 170 |
2019-08-09 | 2019-08-09 | Oilfield Produced Water | 35 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 2555 | 0.0 | 0.0 | 0.0 |
2020 | 2147 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-08 | No Incident Encountered | 0.00 | 0.00 |
2019-08-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]