If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375081305020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.156143,"lon":-115.022092,"icon":""}]} |
Location: 02/05-13-037-08W5/0 | |
Location Alias: 02/05-13-37-08 W5M | |
Location Alias 2: 02/05-13-037-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 08 | |
Section: 13 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 102 FERRIER 5-13-37-8 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0495878 | |
License Date: 2019-09-19 | |
License Status: Amended | |
Spud Date: 2019-09-24 | |
Final Drill Date: 2019-10-05 | |
Well Total Depth: 4932.00 m | |
Surface Hole Latitude: 52.156143 | |
Surface Hole Longitude: -115.022092 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-09-24 | Stampede Drilling A Division Of Matrix Energy Technologi | 6 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-09-29 | 2065.00 | Deviate (5 - 79 degrees) |
2019-10-01 | 2614.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-11-06 | Multi-Stage Fracture | 4885.20 | 4885.30 | 0 |
2019-11-07 | Multi-Stage Fracture | 4723.90 | 4724.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 3111.60 | 3111.70 | 0 |
2019-11-09 | Multi-Stage Fracture | 3093.80 | 3093.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 3075.90 | 3076.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 3058.00 | 3058.10 | 0 |
2019-11-09 | Multi-Stage Fracture | 3040.10 | 3040.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3022.20 | 3022.30 | 0 |
2019-11-09 | Multi-Stage Fracture | 3004.30 | 3004.40 | 0 |
2019-11-09 | Multi-Stage Fracture | 2986.50 | 2986.60 | 0 |
2019-11-09 | Multi-Stage Fracture | 2968.50 | 2968.60 | 0 |
2019-11-09 | Multi-Stage Fracture | 2950.70 | 2950.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4706.00 | 4706.10 | 0 |
2019-11-09 | Multi-Stage Fracture | 2932.80 | 2932.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 2914.90 | 2915.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 2896.90 | 2897.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 2879.10 | 2879.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 2861.30 | 2861.40 | 0 |
2019-11-09 | Multi-Stage Fracture | 2843.30 | 2843.40 | 0 |
2019-11-09 | Multi-Stage Fracture | 2825.50 | 2825.60 | 0 |
2019-11-09 | Multi-Stage Fracture | 2807.50 | 2807.60 | 0 |
2019-11-09 | Multi-Stage Fracture | 2789.60 | 2789.70 | 0 |
2019-11-10 | Multi-Stage Fracture | 2771.60 | 2771.70 | 0 |
2019-11-07 | Multi-Stage Fracture | 4688.10 | 4688.20 | 0 |
2019-11-10 | Multi-Stage Fracture | 2753.80 | 2753.90 | 0 |
2019-11-10 | Multi-Stage Fracture | 2735.90 | 2736.00 | 0 |
2019-11-10 | Multi-Stage Fracture | 2718.00 | 2718.10 | 0 |
2019-11-10 | Multi-Stage Fracture | 2700.00 | 2700.10 | 0 |
2019-11-10 | Multi-Stage Fracture | 2682.10 | 2682.20 | 0 |
2019-11-10 | Multi-Stage Fracture | 2664.20 | 2664.30 | 0 |
2019-11-07 | Multi-Stage Fracture | 4670.10 | 4670.20 | 0 |
2019-11-07 | Multi-Stage Fracture | 4652.30 | 4652.40 | 0 |
2019-11-07 | Multi-Stage Fracture | 4634.40 | 4634.50 | 0 |
2019-11-07 | Multi-Stage Fracture | 4616.40 | 4616.50 | 0 |
2019-11-07 | Multi-Stage Fracture | 4598.50 | 4598.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4580.60 | 4580.70 | 0 |
2019-11-07 | Multi-Stage Fracture | 4562.70 | 4562.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4867.40 | 4867.50 | 0 |
2019-11-07 | Multi-Stage Fracture | 4544.70 | 4544.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4526.80 | 4526.90 | 0 |
2019-11-07 | Multi-Stage Fracture | 4509.00 | 4509.10 | 0 |
2019-11-07 | Multi-Stage Fracture | 4491.10 | 4491.20 | 0 |
2019-11-07 | Multi-Stage Fracture | 4473.20 | 4473.30 | 0 |
2019-11-07 | Multi-Stage Fracture | 4455.30 | 4455.40 | 0 |
2019-11-07 | Multi-Stage Fracture | 4437.40 | 4437.50 | 0 |
2019-11-07 | Multi-Stage Fracture | 4419.50 | 4419.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4401.50 | 4401.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4383.50 | 4383.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4849.40 | 4849.50 | 0 |
2019-11-07 | Multi-Stage Fracture | 4365.60 | 4365.70 | 0 |
2019-11-07 | Multi-Stage Fracture | 4347.70 | 4347.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4329.70 | 4329.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4311.80 | 4311.90 | 0 |
2019-11-07 | Multi-Stage Fracture | 4294.00 | 4294.10 | 0 |
2019-11-07 | Multi-Stage Fracture | 4276.00 | 4276.10 | 0 |
2019-11-07 | Multi-Stage Fracture | 4258.00 | 4258.10 | 0 |
2019-11-07 | Multi-Stage Fracture | 4240.10 | 4240.20 | 0 |
2019-11-07 | Multi-Stage Fracture | 4222.10 | 4222.20 | 0 |
2019-11-07 | Multi-Stage Fracture | 4204.10 | 4204.20 | 0 |
2019-11-07 | Multi-Stage Fracture | 4831.50 | 4831.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4186.20 | 4186.30 | 0 |
2019-11-07 | Multi-Stage Fracture | 4168.20 | 4168.30 | 0 |
2019-11-07 | Multi-Stage Fracture | 4150.30 | 4150.40 | 0 |
2019-11-07 | Multi-Stage Fracture | 4132.40 | 4132.50 | 0 |
2019-11-08 | Multi-Stage Fracture | 4114.50 | 4114.60 | 0 |
2019-11-08 | Multi-Stage Fracture | 4096.60 | 4096.70 | 0 |
2019-11-08 | Multi-Stage Fracture | 4078.70 | 4078.80 | 0 |
2019-11-08 | Multi-Stage Fracture | 4060.80 | 4060.90 | 0 |
2019-11-08 | Multi-Stage Fracture | 4042.90 | 4043.00 | 0 |
2019-11-08 | Multi-Stage Fracture | 4024.90 | 4025.00 | 0 |
2019-11-07 | Multi-Stage Fracture | 4813.60 | 4813.70 | 0 |
2019-11-08 | Multi-Stage Fracture | 4007.00 | 4007.10 | 0 |
2019-11-08 | Multi-Stage Fracture | 3989.00 | 3989.10 | 0 |
2019-11-08 | Multi-Stage Fracture | 3971.10 | 3971.20 | 0 |
2019-11-08 | Multi-Stage Fracture | 3953.20 | 3953.30 | 0 |
2019-11-08 | Multi-Stage Fracture | 3935.20 | 3935.30 | 0 |
2019-11-08 | Multi-Stage Fracture | 3917.20 | 3917.30 | 0 |
2019-11-08 | Multi-Stage Fracture | 3899.30 | 3899.40 | 0 |
2019-11-08 | Multi-Stage Fracture | 3881.40 | 3881.50 | 0 |
2019-11-08 | Multi-Stage Fracture | 3863.50 | 3863.60 | 0 |
2019-11-08 | Multi-Stage Fracture | 3845.50 | 3845.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4795.60 | 4795.70 | 0 |
2019-11-08 | Multi-Stage Fracture | 3827.50 | 3827.60 | 0 |
2019-11-08 | Multi-Stage Fracture | 3809.70 | 3809.80 | 0 |
2019-11-08 | Multi-Stage Fracture | 3791.70 | 3791.80 | 0 |
2019-11-08 | Multi-Stage Fracture | 3773.90 | 3774.00 | 0 |
2019-11-08 | Multi-Stage Fracture | 3756.00 | 3756.10 | 0 |
2019-11-08 | Multi-Stage Fracture | 3738.10 | 3738.20 | 0 |
2019-11-08 | Multi-Stage Fracture | 3720.20 | 3720.30 | 0 |
2019-11-08 | Multi-Stage Fracture | 3702.30 | 3702.40 | 0 |
2019-11-08 | Multi-Stage Fracture | 3684.40 | 3684.50 | 0 |
2019-11-08 | Multi-Stage Fracture | 3666.50 | 3666.60 | 0 |
2019-11-07 | Multi-Stage Fracture | 4777.70 | 4777.80 | 0 |
2019-11-08 | Multi-Stage Fracture | 3648.70 | 3648.80 | 0 |
2019-11-08 | Multi-Stage Fracture | 3630.90 | 3631.00 | 0 |
2019-11-08 | Multi-Stage Fracture | 3613.10 | 3613.20 | 0 |
2019-11-08 | Multi-Stage Fracture | 3595.20 | 3595.30 | 0 |
2019-11-08 | Multi-Stage Fracture | 3577.30 | 3577.40 | 0 |
2019-11-08 | Multi-Stage Fracture | 3559.50 | 3559.60 | 0 |
2019-11-08 | Multi-Stage Fracture | 3541.70 | 3541.80 | 0 |
2019-11-09 | Multi-Stage Fracture | 3523.70 | 3523.80 | 0 |
2019-11-09 | Multi-Stage Fracture | 3505.80 | 3505.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 3487.80 | 3487.90 | 0 |
2019-11-07 | Multi-Stage Fracture | 4759.80 | 4759.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 3470.00 | 3470.10 | 0 |
2019-11-09 | Multi-Stage Fracture | 3452.10 | 3452.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3434.10 | 3434.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3416.10 | 3416.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3398.20 | 3398.30 | 0 |
2019-11-09 | Multi-Stage Fracture | 3380.20 | 3380.30 | 0 |
2019-11-09 | Multi-Stage Fracture | 3362.30 | 3362.40 | 0 |
2019-11-09 | Multi-Stage Fracture | 3344.40 | 3344.50 | 0 |
2019-11-09 | Multi-Stage Fracture | 3326.60 | 3326.70 | 0 |
2019-11-09 | Multi-Stage Fracture | 3308.70 | 3308.80 | 0 |
2019-11-07 | Multi-Stage Fracture | 4741.80 | 4741.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 3290.80 | 3290.90 | 0 |
2019-11-09 | Multi-Stage Fracture | 3272.90 | 3273.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 3254.90 | 3255.00 | 0 |
2019-11-09 | Multi-Stage Fracture | 3237.00 | 3237.10 | 0 |
2019-11-09 | Multi-Stage Fracture | 3219.10 | 3219.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3201.10 | 3201.20 | 0 |
2019-11-09 | Multi-Stage Fracture | 3183.20 | 3183.30 | 0 |
2019-11-09 | Multi-Stage Fracture | 3165.30 | 3165.40 | 0 |
2019-11-09 | Multi-Stage Fracture | 3147.40 | 3147.50 | 0 |
2019-11-09 | Multi-Stage Fracture | 3129.50 | 3129.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-11-06 | 2019-11-10 | 2,430 | 13,786 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 93.4273 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.456 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3237 | N/A | ||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0788 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0788 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0102 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0102 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0489 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0489 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0638 | N/A | |
Methanol | 67-56-1 | 100 | 0.0638 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0638 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-11-06 | 2019-11-10 | Surface Water - Runoff | 13381 |
2019-11-01 | 2019-11-01 | Municipal Water | 60 |
2019-11-02 | 2019-11-09 | Oilfield Produced Water | 240 |
2019-11-05 | 2019-11-10 | Oilfield Produced Water | 390 |
2019-11-05 | 2019-11-10 | Oilfield Produced Water | 30 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1088 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-10-08 | No Incident Encountered | 0.00 | 0.00 |
2019-11-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]