If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375083616020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.228891,"lon":-115.028725,"icon":""}]} |
Location: 02/16-36-037-08W5/0 | |
Location Alias: 02/16-36-37-08 W5M | |
Location Alias 2: 02/16-36-037-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 08 | |
Section: 36 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ FERRIER 16-36-37-8 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0456775 | |
License Date: 2013-05-07 | |
License Status: Amended | |
Spud Date: 2014-05-07 | |
Final Drill Date: 2014-05-21 | |
Well Total Depth: 3837.00 m | |
Surface Hole Latitude: 52.228891 | |
Surface Hole Longitude: -115.028725 |
Date | Event |
---|---|
2013-05-07 | Obtained License |
2014-05-09 | Surface Casing Operation Performed |
2014-05-11 | Well Log Performed |
2014-05-13 | Direction Drilling Operation Performed - Deviate |
2014-05-16 | Direction Drilling Operation Performed - Horizontal |
2014-05-21 | Finished Drilling |
2014-05-21 | Well Log Performed |
2014-05-21 | Well Mode changed to Drilled and Cased |
2014-05-22 | Perforation Treatment Performed - Open-Hole Completion |
2014-05-22 | Production Casing Operation Performed |
2014-05-22 | Well Log Performed |
2014-05-23 | Rig Released |
2014-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-01 | Well Began Production |
2014-07-01 | Well Fluid changed to Crude Oil |
2014-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-05-07 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-05-13 | 1798.70 | Deviate (5 - 79 degrees) |
2014-05-16 | 2490.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-05-22 | Open Hole/Barefoot Completion | 3830.50 | 3837.00 | 0 |
2014-06-09 | Multi-Stage Fracture | 3434.60 | 3435.10 | 0 |
2014-06-09 | Multi-Stage Fracture | 3388.60 | 3389.10 | 0 |
2014-06-09 | Multi-Stage Fracture | 3342.40 | 3342.90 | 0 |
2014-06-09 | Multi-Stage Fracture | 3295.90 | 3296.40 | 0 |
2014-06-09 | Multi-Stage Fracture | 3249.30 | 3249.80 | 0 |
2014-06-09 | Multi-Stage Fracture | 3191.60 | 3192.20 | 0 |
2014-06-09 | Multi-Stage Fracture | 3133.80 | 3134.40 | 0 |
2014-06-09 | Multi-Stage Fracture | 3076.10 | 3076.70 | 0 |
2014-06-09 | Multi-Stage Fracture | 3018.10 | 3018.60 | 0 |
2014-06-09 | Multi-Stage Fracture | 2960.30 | 2960.80 | 0 |
2014-06-09 | Multi-Stage Fracture | 3806.60 | 3807.10 | 0 |
2014-06-09 | Multi-Stage Fracture | 2902.30 | 2902.90 | 0 |
2014-06-09 | Multi-Stage Fracture | 2844.20 | 2844.70 | 0 |
2014-06-09 | Multi-Stage Fracture | 2786.00 | 2786.50 | 0 |
2014-06-09 | Multi-Stage Fracture | 2728.10 | 2728.60 | 0 |
2014-06-09 | Multi-Stage Fracture | 2670.20 | 2670.70 | 0 |
2014-06-09 | Multi-Stage Fracture | 2612.70 | 2613.20 | 0 |
2014-06-09 | Multi-Stage Fracture | 3760.00 | 3760.60 | 0 |
2014-06-09 | Multi-Stage Fracture | 3713.50 | 3714.10 | 0 |
2014-06-09 | Multi-Stage Fracture | 3666.90 | 3667.50 | 0 |
2014-06-09 | Multi-Stage Fracture | 3620.30 | 3620.80 | 0 |
2014-06-09 | Multi-Stage Fracture | 3574.00 | 3574.50 | 0 |
2014-06-09 | Multi-Stage Fracture | 3527.70 | 3528.30 | 0 |
2014-06-09 | Multi-Stage Fracture | 3481.10 | 3481.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-06-09 | 2014-06-09 | 2,342 | 2,856 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.1626 | N/A | |||
RCS Pearl (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 3.2893 | N/A | ||
Polyurethane resin | 67700-43-0 | 100 | 3.2893 | N/A | ||||
Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 9.2775 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.2775 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.2775 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.2775 | N/A | ||||
Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 2.6145 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.6145 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.6145 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.6146 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0237 | N/A | |
Water | 7732-18-5 | 100 | 0.0237 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0782 | N/A | |
Water | 7732-18-5 | 100 | 0.0782 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.3784 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 4.3784 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0946 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0946 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0946 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0808 | N/A | |
Water | 7732-18-5 | 100 | 0.0808 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-06-05 | 2014-06-06 | Surface Water - Runoff | 3000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 4199 | 0.0 | 0.0 | 0.0 |
2015 | 8584 | 0.0 | 0.0 | 0.0 |
2016 | 7882 | 0.0 | 0.0 | 0.0 |
2017 | 8298 | 0.0 | 0.0 | 0.0 |
2018 | 8644 | 0.0 | 0.0 | 0.0 |
2019 | 8374 | 0.0 | 0.0 | 0.0 |
2020 | 1915 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-05-23 | No Incident Encountered | 0.00 | 0.00 |
2014-06-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]