X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375092811000

Well Details

Well ID: 0375092811000
Loading map...
Location: 00/11-28-037-09W5/0
Location Alias: 00/11-28-37-09 W5M
Location Alias 2: 00/11-28-037-09 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 09
Section: 28
County/Municipality: Clearwater County
Well Name: NAL FERRIER 11-28-37-9
Operator Name: NAL Resources Limited
License Number: 0036988
License Date: 1969-10-07
License Status: Abandoned
Spud Date: 1969-10-17
Final Drill Date: 1969-12-28
Well Total Depth: 4208.10 m
Surface Hole Latitude: 52.210189
Surface Hole Longitude: -115.232014

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-10-07 Obtained License
1969-12-14 Drill Stem Test Performed
1969-12-28 Finished Drilling
1969-12-30 Well Log Performed
1970-01-02 Production Casing Operation Performed
1970-01-05 Perforation Treatment Performed - Jet Perforation
1970-01-14 Perforation Treatment Performed - Jet Perforation
1970-01-18 Drill Stem Test Performed
1970-01-19 Perforation Treatment Performed - Cement Squeeze
1970-01-20 Perforation Treatment Performed - Jet Perforation
1970-01-21 Drill Stem Test Performed
1970-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-24 Perforation Treatment Performed - Cement Squeeze
1970-02-01 Perforation Treatment Performed - Jet Perforation
1970-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-28 Well Mode changed to Drilled and Cased
1971-02-06 Well Began Production
1971-02-06 Well Fluid changed to Gas
1971-02-06 Well Mode changed to Flowing
1975-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-23 Well Fluid changed to Gas
1983-06-23 Well Mode changed to Suspended
1989-10-26 Perforation Treatment Performed - Cement Plug
1989-10-26 Plug Back Performed
1989-10-27 Well Log Performed
1989-10-28 Perforation Treatment Performed - Jet Perforation
1989-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-01 Plug Back Performed
1989-11-01 Well Log Performed
1989-11-02 Perforation Treatment Performed - Jet Perforation
1989-11-04 Perforation Treatment Performed - Alcohol Squeeze
1989-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-09 Plug Back Performed
1989-11-09 Well Fluid changed to Gas
1989-11-09 Well Log Performed
1989-11-09 Well Mode changed to Abandoned
1989-11-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-05 Perforation 3889.20 3890.50 13
1970-02-01 Perforation 4092.90 4097.40 3
1970-02-01 Perforation 4102.00 4106.60 3
1970-03-16 Acid Treatment 4065.40 4106.60 0
1975-10-31 Acid Treatment 4065.40 4106.60 0
1989-10-26 Cement Plug 4008.00 4017.00 0
1989-10-28 Perforation 4005.00 4005.30 5
1989-11-01 Packing Device Capped w/Cement 3671.00 3700.00 0
1989-11-02 Perforation 3194.00 3197.00 13
1989-11-04 Alchohol Squeeze 3194.00 3197.00 0
1989-11-09 Packing Device Capped w/Cement 3171.00 3181.00 0
1970-01-14 Perforation 3895.60 3898.10 13
1970-01-14 Perforation 3908.10 3909.70 13
1970-01-19 Cement Squeeze 3889.20 3909.70 0
1970-01-20 Perforation 3628.90 3630.20 13
1970-01-22 Acid Treatment 3628.90 3630.20 0
1970-01-24 Cement Squeeze 3628.90 3630.20 0
1970-02-01 Perforation 4065.40 4070.00 3
1970-02-01 Perforation 4080.40 4084.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1971 7405 0.0 0.0 0.0
1972 8583 0.0 0.0 0.0
1973 8361 0.0 0.0 0.0
1974 8588 0.0 0.0 0.0
1975 8328 0.0 0.0 0.0
1976 8476 0.0 0.0 0.0
1977 2779 0.0 0.0 0.0
1979 645 0.0 0.0 0.0
1981 374 0.0 0.0 0.0

For data sources see[5]

References