If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384011711030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.271998,"lon":-110.117345,"icon":""}]} |
| Location: 03/11-17-038-01W4/0 | |
| Location Alias: 03/11-17-38-01 W4M | |
| Location Alias 2: 03/11-17-038-01 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 17 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: WISER 11D2 HZ PROVOST 11-17-38-1 | |
| Operator Name: Prairie Provident Resources Canada Ltd. | |
| License Number: 0257198 | |
| License Date: 2001-07-10 | |
| License Status: Suspension | |
| Spud Date: 2001-07-17 | |
| Final Drill Date: 2001-07-20 | |
| Well Total Depth: 1051.00 m | |
| Surface Hole Latitude: 52.271998 | |
| Surface Hole Longitude: -110.117345 |
| Date | Event |
|---|---|
| 2001-07-10 | Obtained License |
| 2001-07-18 | Surface Casing Operation Performed |
| 2001-07-19 | Direction Drilling Operation Performed - Horizontal |
| 2001-07-20 | Finished Drilling |
| 2001-07-20 | Well Log Performed |
| 2001-07-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2001-07-21 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2001-07-21 | Production Casing Operation Performed |
| 2001-07-22 | Rig Released |
| 2001-07-22 | Well Mode changed to Drilled and Cased |
| 2001-08-04 | Well Began Production |
| 2001-08-04 | Well Fluid changed to Crude Oil |
| 2001-08-04 | Well Mode changed to Pumping |
| 2014-02-28 | Well Fluid changed to Crude Oil |
| 2014-02-28 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2001-07-19 | 525.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-07-21 | Slotted Liner | 931.00 | 1045.00 | 0 |
| 2001-07-21 | Open Hole/Barefoot Completion | 1045.00 | 1051.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 3105 | 0.0 | 0.0 | 0.0 |
| 2002 | 6705 | 0.0 | 0.0 | 0.0 |
| 2003 | 8360 | 0.0 | 0.0 | 0.0 |
| 2004 | 8332 | 0.0 | 0.0 | 0.0 |
| 2005 | 7750 | 0.0 | 0.0 | 0.0 |
| 2006 | 8422 | 0.0 | 0.0 | 0.0 |
| 2007 | 8206 | 0.0 | 0.0 | 0.0 |
| 2008 | 5900 | 0.0 | 0.0 | 0.0 |
| 2009 | 6060 | 0.0 | 0.0 | 0.0 |
| 2010 | 8584 | 0.0 | 0.0 | 0.0 |
| 2011 | 6908 | 0.0 | 0.0 | 0.0 |
| 2012 | 8729 | 0.0 | 0.0 | 0.0 |
| 2013 | 6524 | 0.0 | 0.0 | 0.0 |
For data sources see[6]