X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384081913000

Well Details

Well ID: 0384081913000
Loading map...
Location: 00/13-19-038-08W4/0
Location Alias: 00/13-19-38-08 W4M
Location Alias 2: 00/13-19-038-08 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 08
Section: 19
County/Municipality: County of Paintearth No. 18
Well Name: SOC PROVOST 13-19-38-8
Operator Name: AlphaBow Energy Ltd.
License Number: 0160860
License Date: 1993-09-08
License Status: Issued
Spud Date: 1993-09-08
Final Drill Date: 1993-09-10
Well Total Depth: 990.00 m
Surface Hole Latitude: 52.287944
Surface Hole Longitude: -111.143851

For data sources see[1][2]

Well History

Date Event
1993-09-08 Obtained License
1993-09-08 Well Log Performed
1993-09-09 Surface Casing Operation Performed
1993-09-10 Drill Stem Test Performed
1993-09-10 Finished Drilling
1993-09-10 Well Log Performed
1993-09-10 Well Mode changed to Drilled and Cased
1993-09-11 Production Casing Operation Performed
1993-09-12 Rig Released
1993-09-15 Perforation Treatment Performed - Jet Perforation
1993-09-15 Well Log Performed
1993-09-18 Perforation Treatment Performed - Fractured
1993-09-19 Perforation Treatment Performed - Jet Perforation
1993-09-19 Well Log Performed
1993-09-20 Perforation Treatment Performed - Jet Perforation
1993-09-20 Well Log Performed
1993-09-25 Well Began Production
1993-09-25 Well Fluid changed to Crude Oil
1993-09-25 Well Mode changed to Pumping
1997-01-17 Perforation Treatment Performed - Jet Perforation
2006-11-17 Well Log Performed
2006-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-18 Perforation Treatment Performed - Jet Perforation
2006-11-18 Plug Back Performed
2006-11-18 Well Fluid changed to Crude Oil
2006-11-18 Well Log Performed
2006-11-18 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-09-15 Perforation 945.50 947.20 13
1993-09-18 Fracture 945.50 947.20 0
1993-09-19 Perforation 945.50 947.20 13
1993-09-20 Perforation 947.70 949.30 13
1997-01-17 Perforation 941.20 945.50 13
2006-11-18 Packing Device Capped w/Cement 926.00 934.00 0
2006-11-18 Perforation 793.50 794.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2282 0.0 0.0 0.0
1994 8519 0.0 0.0 0.0
1995 8689 0.0 0.0 0.0
1996 8758 0.0 0.0 0.0
1997 8420 0.0 0.0 0.0
1998 8301 0.0 0.0 0.0
1999 8257 0.0 0.0 0.0
2000 8627 0.0 0.0 0.0
2001 6840 0.0 0.0 0.0
2002 8580 0.0 0.0 0.0
2003 1272 0.0 0.0 0.0

For data sources see[5]

References