X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384102004000

Well Details

Well ID: 0384102004000
Loading map...
Location: 00/04-20-038-10W4/0
Location Alias: 00/04-20-38-10 W4M
Location Alias 2: 00/04-20-038-10 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 10
Section: 20
County/Municipality: County of Paintearth No. 18
Well Name: EQUAL HZ 4C PROVOST 4-20-38-10
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0431155
License Date: 2011-02-03
License Status: Abandoned
Spud Date: 2011-02-11
Final Drill Date: 2011-02-20
Well Total Depth: 2361.00 m
Surface Hole Latitude: 52.290367
Surface Hole Longitude: -111.405159

For data sources see[1][2]

Well History

Date Event
2011-02-03 Obtained License
2011-02-12 Surface Casing Operation Performed
2011-02-13 Direction Drilling Operation Performed - Horizontal
2011-02-15 Intermediate Casing Operation Performed
2011-02-20 Finished Drilling
2011-02-20 Well Log Performed
2011-02-20 Well Mode changed to Drilled and Cased
2011-02-22 Liner Casing Operation Performed
2011-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-22 Perforation Treatment Performed - Open-Hole Completion
2011-02-22 Rig Released
2011-02-24 Well Log Performed
2011-03-22 Well Log Performed
2011-03-26 Well Began Production
2011-03-26 Well Fluid changed to Crude Oil
2011-03-26 Well Mode changed to Pumping
2016-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-10-31 Plug Back Performed
2016-10-31 Well Fluid changed to Crude Oil
2016-10-31 Well Mode changed to Abandoned Zone
2016-11-27 Well Abandoned
2016-11-27 Well Fluid changed to Crude Oil
2016-11-27 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-13 409.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-22 Open Hole/Barefoot Completion 2341.80 2361.00 0
2011-02-22 Multi-Stage Fracture 2211.50 2211.60 0
2011-02-22 Multi-Stage Fracture 2319.10 2319.20 0
2016-10-31 Packing Device Capped w/Cement 929.00 1006.00 0
2011-02-22 Multi-Stage Fracture 1161.20 1161.30 0
2011-02-22 Multi-Stage Fracture 1248.30 1248.40 0
2011-02-22 Multi-Stage Fracture 1514.60 1514.70 0
2011-02-22 Multi-Stage Fracture 1628.80 1628.90 0
2011-02-22 Multi-Stage Fracture 1743.30 1743.40 0
2011-02-22 Multi-Stage Fracture 1857.70 1857.80 0
2011-02-22 Multi-Stage Fracture 1971.90 1972.00 0
2011-02-22 Multi-Stage Fracture 2099.90 2100.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6472 0.0 0.0 0.0
2012 8684 0.0 0.0 0.0
2013 8055 0.0 0.0 0.0
2014 1464 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-02-22 No Incident Encountered 0.00 0.00
2016-10-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References