X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384103106000

Well Details

Well ID: 0384103106000
Loading map...
Location: 00/06-31-038-10W4/0
Location Alias: 00/06-31-38-10 W4M
Location Alias 2: 00/06-31-038-10 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 10
Section: 31
County/Municipality: County of Paintearth No. 18
Well Name: SPUR 13-30 HZ PROVOST 6-31-38-10
Operator Name: Tamarack Acquisition Corp.
License Number: 0437565
License Date: 2011-10-11
License Status: Issued
Spud Date: 2011-10-17
Final Drill Date: 2011-10-19
Well Total Depth: 1610.00 m
Surface Hole Latitude: 52.302638
Surface Hole Longitude: -111.427513

For data sources see[1][2]

Well History

Date Event
2011-10-11 Obtained License
2011-10-17 Surface Casing Operation Performed
2011-10-18 Direction Drilling Operation Performed - Deviate
2011-10-18 Well Log Performed
2011-10-19 Direction Drilling Operation Performed - Horizontal
2011-10-19 Finished Drilling
2011-10-19 Well Mode changed to Drilled and Cased
2011-10-20 Production Casing Operation Performed
2011-10-21 Rig Released
2011-10-31 Well Log Performed
2011-11-01 Perforation Treatment Performed - Jet Perforation
2011-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-25 Well Began Production
2011-11-25 Well Fluid changed to Crude Oil
2011-11-25 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-18 579.80 Deviate (5 - 79 degrees)
2011-10-19 970.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-01 Perforation 1494.00 1494.50 20
2011-11-03 Multi-Stage Fracture 1494.00 1494.50 0
2011-11-03 Multi-Stage Fracture 1445.00 1445.50 0
2011-11-03 Multi-Stage Fracture 1388.00 1388.50 0
2011-11-03 Multi-Stage Fracture 1336.00 1336.50 0
2011-11-03 Multi-Stage Fracture 1290.00 1290.50 0
2011-11-03 Multi-Stage Fracture 1228.00 1228.50 0
2011-11-03 Multi-Stage Fracture 1140.00 1140.50 0
2011-11-03 Multi-Stage Fracture 1077.00 1077.50 0
2011-11-03 Multi-Stage Fracture 1023.00 1023.50 0
2011-11-01 Perforation 1445.00 1445.50 20
2011-11-01 Perforation 1388.00 1388.50 20
2011-11-01 Perforation 1336.00 1336.50 20
2011-11-01 Perforation 1290.00 1290.50 20
2011-11-01 Perforation 1228.00 1228.50 20
2011-11-01 Perforation 1140.00 1140.50 20
2011-11-01 Perforation 1077.00 1077.50 20
2011-11-01 Perforation 1023.00 1023.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 296 0.0 0.0 0.0
2012 8040 0.0 0.0 0.0
2013 8267 0.0 0.0 0.0
2014 7932 0.0 0.0 0.0
2015 6551 0.0 0.0 0.0
2016 8351 0.0 0.0 0.0
2017 1917 0.0 0.0 0.0
2018 3432 0.0 0.0 0.0
2019 6696 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[6]

References