X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384110804000

Well Details

Well ID: 0384110804000
Loading map...
Location: 00/04-08-038-11W4/0
Location Alias: 00/04-08-38-11 W4M
Location Alias 2: 00/04-08-038-11 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 11
Section: 08
County/Municipality: County of Paintearth No. 18
Well Name: ACL HZ PROVOST 4-8-38-11
Operator Name: Karve Energy Inc.
License Number: 0441481
License Date: 2011-12-15
License Status: Issued
Spud Date: 2012-01-06
Final Drill Date: 2012-01-14
Well Total Depth: 2184.00 m
Surface Hole Latitude: 52.248629
Surface Hole Longitude: -111.527035

For data sources see[1][2]

Well History

Date Event
2011-12-15 Obtained License
2012-01-07 Surface Casing Operation Performed
2012-01-08 Direction Drilling Operation Performed - Deviate
2012-01-09 Direction Drilling Operation Performed - Horizontal
2012-01-09 Well Log Performed
2012-01-10 Intermediate Casing Operation Performed
2012-01-14 Finished Drilling
2012-01-14 Well Log Performed
2012-01-14 Well Mode changed to Drilled and Cased
2012-01-16 Liner Casing Operation Performed
2012-01-16 Rig Released
2012-01-28 Well Log Performed
2012-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-02 Well Began Production
2012-06-02 Well Fluid changed to Crude Oil
2012-06-02 Well Mode changed to Flowing
2012-07-05 Well Fluid changed to Crude Oil
2012-07-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-06 Ensign Drilling Inc. 512 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-08 517.00 Deviate (5 - 79 degrees)
2012-01-09 1022.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Multi-Stage Fracture 1933.00 1933.10 0
2012-02-04 Multi-Stage Fracture 1508.50 1508.60 0
2012-02-04 Multi-Stage Fracture 1594.70 1594.80 0
2012-02-04 Multi-Stage Fracture 1682.20 1682.30 0
2012-02-04 Multi-Stage Fracture 1758.80 1758.90 0
2012-02-04 Multi-Stage Fracture 1845.70 1845.80 0
2012-02-03 Multi-Stage Fracture 2006.80 2006.90 0
2012-02-03 Multi-Stage Fracture 2076.50 2076.60 0
2012-02-03 Multi-Stage Fracture 2163.30 2163.40 0
2012-02-04 Multi-Stage Fracture 1101.10 1101.20 0
2012-02-04 Multi-Stage Fracture 1176.90 1177.00 0
2012-02-04 Multi-Stage Fracture 1275.00 1275.10 0
2012-02-04 Multi-Stage Fracture 1347.40 1347.50 0
2012-02-04 Multi-Stage Fracture 1434.60 1434.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4747 0.0 0.0 0.0
2013 8717 0.0 0.0 0.0
2014 8691 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8761 0.0 0.0 0.0
2017 8625 0.0 0.0 0.0
2018 8551 0.0 0.0 0.0
2019 8739 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References