X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384111209000

Well Details

Well ID: 0384111209000
Loading map...
Location: 00/09-12-038-11W4/0
Location Alias: 00/09-12-38-11 W4M
Location Alias 2: 00/09-12-038-11 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 11
Section: 12
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 9-12-38-11
Operator Name: Battle River Energy Ltd.
License Number: 0272430
License Date: 2002-08-06
License Status: Amended
Spud Date: 2002-09-23
Final Drill Date: 2002-09-27
Well Total Depth: 1020.00 m
Surface Hole Latitude: 52.251331
Surface Hole Longitude: -111.434588

For data sources see[1][2]

Well History

Date Event
2002-08-06 Obtained License
2002-09-23 Surface Casing Operation Performed
2002-09-25 Direction Drilling Operation Performed - Deviate
2002-09-27 Finished Drilling
2002-09-27 Well Log Performed
2002-09-28 Production Casing Operation Performed
2002-09-28 Rig Released
2002-09-28 Well Mode changed to Drilled and Cased
2002-10-04 Perforation Treatment Performed - Jet Perforation
2002-10-04 Well Log Performed
2002-11-05 Well Began Production
2002-11-05 Well Fluid changed to Gas
2002-11-05 Well Mode changed to Flowing
2003-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-12 Perforation Treatment Performed - Jet Perforation
2003-03-12 Plug Back Performed
2003-03-12 Well Fluid changed to Gas
2003-03-12 Well Log Performed
2003-03-12 Well Mode changed to Abandoned Zone
2003-06-07 Perforation Treatment Performed - Fractured
2007-05-18 Perforation Treatment Performed - Jet Perforation
2007-05-18 Well Log Performed
2007-05-25 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-09-25 543.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-04 Perforation 971.00 973.00 17
2003-03-12 Packing Device Capped w/Cement 961.00 969.00 0
2003-03-12 Perforation 914.00 918.00 17
2003-06-07 Fracture 914.00 918.00 0
2007-05-18 Perforation 826.50 828.50 17
2007-05-25 Fracture 826.50 828.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1326 0.0 0.0 0.0
2003 1725 0.0 0.0 0.0

For data sources see[6]

References