X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384113112000

Well Details

Well ID: 0384113112000
Loading map...
Location: 00/12-31-038-11W4/0
Location Alias: 00/12-31-38-11 W4M
Location Alias 2: 00/12-31-038-11 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 11
Section: 31
County/Municipality: County of Paintearth No. 18
Well Name: SPUR 14-30 HZ PROVOST 12-31-38-11
Operator Name: Tamarack Acquisition Corp.
License Number: 0437562
License Date: 2011-10-07
License Status: Issued
Spud Date: 2011-10-21
Final Drill Date: 2011-10-24
Well Total Depth: 1877.00 m
Surface Hole Latitude: 52.302428
Surface Hole Longitude: -111.570255

For data sources see[1][2]

Well History

Date Event
2011-10-07 Obtained License
2011-10-21 Surface Casing Operation Performed
2011-10-22 Well Log Performed
2011-10-23 Direction Drilling Operation Performed - Deviate
2011-10-23 Direction Drilling Operation Performed - Horizontal
2011-10-24 Finished Drilling
2011-10-24 Well Mode changed to Drilled and Cased
2011-10-25 Production Casing Operation Performed
2011-10-26 Rig Released
2011-10-31 Well Log Performed
2011-12-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-12-09 Perforation Treatment Performed - Jet Perforation
2011-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-16 Well Began Production
2011-12-16 Well Fluid changed to Crude Oil
2011-12-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-23 597.00 Deviate (5 - 79 degrees)
2011-10-23 939.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-09 Hydra Jet Perforation 1723.00 1723.10 0
2011-12-09 Perforation 1047.50 1047.60 2
2011-12-09 Perforation 1014.20 1014.30 2
2011-12-09 Hydra Jet Perforation 999.00 999.10 0
2011-12-09 Multi-Stage Fracture 1723.00 1723.10 0
2011-12-09 Multi-Stage Fracture 1669.80 1669.90 0
2011-12-09 Multi-Stage Fracture 1464.60 1464.70 0
2011-12-09 Multi-Stage Fracture 1395.40 1395.50 0
2011-12-09 Multi-Stage Fracture 1306.80 1306.90 0
2011-12-09 Multi-Stage Fracture 1261.20 1261.30 0
2011-12-09 Multi-Stage Fracture 1207.70 1207.80 0
2011-12-09 Perforation 1669.80 1669.90 2
2011-12-09 Multi-Stage Fracture 1166.30 1166.40 0
2011-12-09 Multi-Stage Fracture 1101.00 1101.10 0
2011-12-09 Multi-Stage Fracture 1047.50 1047.60 0
2011-12-09 Multi-Stage Fracture 999.00 999.10 0
2011-12-09 Perforation 1464.60 1464.70 2
2011-12-09 Perforation 1395.40 1395.50 2
2011-12-09 Perforation 1306.80 1306.90 2
2011-12-09 Perforation 1261.20 1261.30 2
2011-12-09 Perforation 1207.70 1207.80 2
2011-12-09 Perforation 1166.30 1166.40 2
2011-12-09 Perforation 1101.00 1101.10 2

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 360 0.0 0.0 0.0
2012 8516 0.0 0.0 0.0
2013 7991 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8103 0.0 0.0 0.0
2017 7367 0.0 0.0 0.0
2018 8615 0.0 0.0 0.0
2019 8052 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References