If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384122309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.285191,"lon":-111.628798,"icon":""}]} |
| Location: 00/09-23-038-12W4/0 | |
| Location Alias: 00/09-23-38-12 W4M | |
| Location Alias 2: 00/09-23-038-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 23 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: ACL HZ PROVOST 9-23-38-12 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0447477 | |
| License Date: 2012-07-31 | |
| License Status: Issued | |
| Spud Date: 2012-08-15 | |
| Final Drill Date: 2012-08-22 | |
| Well Total Depth: 2420.00 m | |
| Surface Hole Latitude: 52.285191 | |
| Surface Hole Longitude: -111.628798 |
| Date | Event |
|---|---|
| 2012-07-31 | Obtained License |
| 2012-08-15 | Well Log Performed |
| 2012-08-16 | Surface Casing Operation Performed |
| 2012-08-17 | Direction Drilling Operation Performed - Deviate |
| 2012-08-17 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-19 | Intermediate Casing Operation Performed |
| 2012-08-22 | Finished Drilling |
| 2012-08-22 | Well Log Performed |
| 2012-08-22 | Well Mode changed to Drilled and Cased |
| 2012-08-23 | Liner Casing Operation Performed |
| 2012-08-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-24 | Rig Released |
| 2012-09-09 | Well Log Performed |
| 2012-09-10 | Well Log Performed |
| 2012-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-14 | Well Began Production |
| 2012-10-14 | Well Fluid changed to Crude Oil |
| 2012-10-14 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-15 | Trinidad Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-17 | 476.00 | Deviate (5 - 79 degrees) |
| 2012-08-17 | 981.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-23 | Open Hole/Barefoot Completion | 2415.00 | 2420.00 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1947.10 | 1947.20 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 2044.10 | 2044.20 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 2141.80 | 2141.90 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 2227.70 | 2227.80 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 2313.00 | 2313.10 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 2394.30 | 2394.40 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1229.20 | 1229.30 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1324.60 | 1324.70 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1410.10 | 1410.20 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1506.90 | 1507.00 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1604.40 | 1604.50 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1701.30 | 1701.40 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1798.60 | 1798.70 | 0 |
| 2012-09-20 | Multi-Stage Fracture | 1849.80 | 1849.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1656 | 0.0 | 0.0 | 0.0 |
| 2013 | 1828 | 0.0 | 0.0 | 0.0 |
| 2014 | 4398 | 0.0 | 0.0 | 0.0 |
| 2015 | 8256 | 0.0 | 0.0 | 0.0 |
| 2016 | 6473 | 0.0 | 0.0 | 0.0 |
| 2017 | 2290 | 0.0 | 0.0 | 0.0 |
| 2018 | 3751 | 0.0 | 0.0 | 0.0 |
| 2019 | 7264 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-24 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]