X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122309000

Well Details

Well ID: 0384122309000
Loading map...
Location: 00/09-23-038-12W4/0
Location Alias: 00/09-23-38-12 W4M
Location Alias 2: 00/09-23-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: ACL HZ PROVOST 9-23-38-12
Operator Name: Karve Energy Inc.
License Number: 0447477
License Date: 2012-07-31
License Status: Issued
Spud Date: 2012-08-15
Final Drill Date: 2012-08-22
Well Total Depth: 2420.00 m
Surface Hole Latitude: 52.285191
Surface Hole Longitude: -111.628798

For data sources see[1][2]

Well History

Date Event
2012-07-31 Obtained License
2012-08-15 Well Log Performed
2012-08-16 Surface Casing Operation Performed
2012-08-17 Direction Drilling Operation Performed - Deviate
2012-08-17 Direction Drilling Operation Performed - Horizontal
2012-08-19 Intermediate Casing Operation Performed
2012-08-22 Finished Drilling
2012-08-22 Well Log Performed
2012-08-22 Well Mode changed to Drilled and Cased
2012-08-23 Liner Casing Operation Performed
2012-08-23 Perforation Treatment Performed - Open-Hole Completion
2012-08-24 Rig Released
2012-09-09 Well Log Performed
2012-09-10 Well Log Performed
2012-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-14 Well Began Production
2012-10-14 Well Fluid changed to Crude Oil
2012-10-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-15 Trinidad Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-17 476.00 Deviate (5 - 79 degrees)
2012-08-17 981.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-23 Open Hole/Barefoot Completion 2415.00 2420.00 0
2012-09-20 Multi-Stage Fracture 1947.10 1947.20 0
2012-09-20 Multi-Stage Fracture 2044.10 2044.20 0
2012-09-20 Multi-Stage Fracture 2141.80 2141.90 0
2012-09-20 Multi-Stage Fracture 2227.70 2227.80 0
2012-09-20 Multi-Stage Fracture 2313.00 2313.10 0
2012-09-20 Multi-Stage Fracture 2394.30 2394.40 0
2012-09-20 Multi-Stage Fracture 1229.20 1229.30 0
2012-09-20 Multi-Stage Fracture 1324.60 1324.70 0
2012-09-20 Multi-Stage Fracture 1410.10 1410.20 0
2012-09-20 Multi-Stage Fracture 1506.90 1507.00 0
2012-09-20 Multi-Stage Fracture 1604.40 1604.50 0
2012-09-20 Multi-Stage Fracture 1701.30 1701.40 0
2012-09-20 Multi-Stage Fracture 1798.60 1798.70 0
2012-09-20 Multi-Stage Fracture 1849.80 1849.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1656 0.0 0.0 0.0
2013 1828 0.0 0.0 0.0
2014 4398 0.0 0.0 0.0
2015 8256 0.0 0.0 0.0
2016 6473 0.0 0.0 0.0
2017 2290 0.0 0.0 0.0
2018 3751 0.0 0.0 0.0
2019 7264 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-24 No Incident Encountered 0.00 0.00
2012-10-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References