X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384131607000

Well Details

Well ID: 0384131607000
Loading map...
Location: 00/07-16-038-13W4/0
Location Alias: 00/07-16-38-13 W4M
Location Alias 2: 00/07-16-038-13 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 13
Section: 16
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 7-16-38-13
Operator Name: Karve Energy Inc.
License Number: 0053212
License Date: 1975-03-07
License Status: Abandoned
Spud Date: 1975-03-15
Final Drill Date: 1975-03-19
Well Total Depth: 1036.30 m
Surface Hole Latitude: 52.263723
Surface Hole Longitude: -111.798445

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-07 Obtained License
1975-03-18 Drill Stem Test Performed
1975-03-19 Finished Drilling
1975-03-20 Drill Stem Test Performed
1975-03-21 Drill Stem Test Performed
1975-03-22 Production Casing Operation Performed
1975-03-22 Well Mode changed to Drilled and Cased
1975-04-09 Perforation Treatment Performed - Jet Perforation
1978-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-06-12 Perforation Treatment Performed - Jet Perforation
1979-03-30 Well Began Production
1979-03-30 Well Fluid changed to Gas
1979-03-30 Well Mode changed to Flowing
2009-12-01 Well Fluid changed to Gas
2009-12-01 Well Mode changed to Suspended
2018-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-05 Plug Back Performed
2018-11-05 Well Fluid changed to Gas
2018-11-05 Well Mode changed to Abandoned Zone
2019-11-28 Well Abandoned
2019-11-28 Well Fluid changed to Gas
2019-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-04-09 Perforation 1009.80 1013.20 13
1978-06-12 Packing Device Capped w/Cement 996.70 996.70 0
1978-06-12 Perforation 897.90 899.20 7
1978-06-12 Perforation 900.40 902.20 7
2018-11-05 Packing Device Capped w/Cement 882.30 890.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5830 0.0 0.0 0.0
1980 8390 0.0 0.0 0.0
1981 8228 0.0 0.0 0.0
1982 8296 0.0 0.0 0.0
1983 8693 0.0 0.0 0.0
1984 8455 0.0 0.0 0.0
1985 8499 0.0 0.0 0.0
1986 8493 0.0 0.0 0.0
1987 7327 0.0 0.0 0.0
1988 7785 0.0 0.0 0.0
1989 6793 0.0 0.0 0.0
1990 6473 0.0 0.0 0.0
1991 7937 0.0 0.0 0.0
1992 8112 0.0 0.0 0.0
1993 7153 0.0 0.0 0.0
1994 7855 0.0 0.0 0.0
1995 2897 0.0 0.0 0.0
1996 5189 0.0 0.0 0.0
1997 5138 0.0 0.0 0.0
1998 3694 0.0 0.0 0.0
1999 3994 0.0 0.0 0.0
2000 792 0.0 0.0 0.0
2004 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References